BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 3, 2025 at 7:00 PM

Updated November 5, 2025

Demolition, site work, paving and new construction of a mixed-use development in Gainesville, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a pre-engineered storage facility; for the construction of a 27,890-square-foot pre-engineered storage facility; pre-engineered storage facility; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project consists of the demolition of the existing evidence storage building and construction of a new three-story, 27,890 square foot facility in its place. The structure of the new facility is to be structural steel framework supported by shallow foundations on subsurface ground improvement, enclosed in reinforced CMU walls. The façade of the building consists of multiple materials, including brick, perforated metal panels, metal panel cladding system, and aluminum windows. The first floor provides evidence intake and processing, property viewing and return, storage, and blood drying. The second floor provides office workspaces, conference room, and bulk evidence storage. The third floor offers additional bulk evidence storage. The new building will connect to the existing Gainesville Police Department Headquarters Building at the second-floor level via an enclosed elevated pedestrian bridge. Sitework includes relocation of several existing utilities, modification of existing dry stormwater retention areas, limited flexible paving, installation of two new chillers, and an emergency generator. Only bidders meeting prequalification criteria will be allowed to participate in the bidding phase of this project. All bidder prequalification efforts regarding this project should be coordinated directly with the Ajax contact person(s) listed below: Ajax Building Company, LLC Attn.: Jeff Chamberlain 12425 Race Track Rd, Ste 101 Tampa, FL 33626 Phone: 813.539.2668 E-Mail: jeff.chamberlain@ajaxbuilding.com Construction Start: February 18, 2026 Substantial Completion: June 04, 2027 Final Completion: July 07, 2027

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$4,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
97
Bidding Soon
1,605
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2025

February 18, 2026

Project location map

515 NW 8th Ave, Gainesville, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.