BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 26, 2025 at 7:00 PM

Updated December 27, 2025

Site work and new construction of a development in Mora, New Mexico. Completed plans call for the construction of a one-story above grade development.

**As of December 26, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Construction of a new Veterans Memorial for the County of Mora. Construction includes Memorial pad over-excavation and recompaction, grading, utility rough-in, construction of site concrete, concrete walls, brick pavers and granite plaques. A bid must be submitted on all bid items and alternates; segregated bids will not be accepted. Base Bid price shall not include state gross receipts or local options taxes. However, estimated tax shall be shown on the bid. All work shall be in accordance with applicable state laws and is subject to the minimum wage rate determination issued by the office of the Labor Commissioner for this project. Bid security in the form of a surety bond executed by a surety company authorized to do business in the state of New Mexico in the amount of 5% of the total bid, or the equivalent in cash by means of a cashier's check or in a form satisfactory to the Owner, must accompany each bid. A 100% performance bond and a 100% payment and materials bond executed by a surety company authorized to do business in this state and said surety to be approved in federal circular 570 as published by the United States treasury department shall be required from the successful Bidder. A completed Subcontractor Listing Form must accompany each bid. The Bidding Documents contain a time for completion of the work and further impose liquidated damages for failure to complete the work within that time period. No Bidder may withdraw his bid for 45 days after the actual date of the opening thereof. The Owner intends to award this Project to the lowest responsible Bidder. The Owner reserves the right to reject any and all bids, to waive technical irregularities, and to award the contract to the Bidder whose bid it deems to be in the best interest of the Owner. The Bidder's attention is directed to the requirements of the Contract Documents for adherence to applicable federal, state and local statutes, regulations and ordinances; including but not limited to, requirements as to conditions of employment to be observed, minimum wage rates to be paid under the Contract, Section 3, Segregated Facilities, Section 109, Executive Order 11246, and bonding and insurance requirements. Construction Budget is between $350,000.00 to $400,000.00. Questions / Clarifications: Via Email only to: Tom Cordova: tome@lloyd-architects.com Final date to ask questions: 12/11/2025 COB Current Addendum 3: We will be issuing another Addendum on 11/26/2025 with the Wage Rate determination, or we will issue another extension if these are not available. Current Addendum is 4 as of 11/26/25. Current Addendum is 5 as of 12/5/25. Current Addendum is 6 as of 12/12/25. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Conservation and Development

$491,063.00

Public - County

New Construction, Site Work

22

15

12

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
11
Bidding Soon
211
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

December 25, 2025

Project location map

1 Courthouse Dr, Mora, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.