BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated December 3, 2025

Renovation of a mixed-use development in San Antonio, Texas. Completed plans call for the renovation of a one-story above grade educational facility; one-story above grade educational facility; and one-story above grade educational facility.

The Project is described as follows: The project is generally described as follows: MEP upgrades at Hopkins Elementary, Masters Elementary, Judson Middle School and Judson High School as indicated on the drawings and specifications to include all general construction, heating, air conditioning, electrical, plumbing and all other work as indicated on the construction documents. Hopkins Elementary to include energy controls upgrades. Master Elementary to include lighting upgrades. Judson Middle School Energy Controls Upgrades. Judson High School to include energy controls upgrades, hydronic boiler system upgrades, lighting upgrades and emergency generator upgrades. The Project must be complete and ready for occupancy not later than 358 calendar days after receipt of the Notice to Proceed. QA date :- 11/18/2025 at 2pm All questions related to this request concerning documents, terms and conditions or contractual obligations shall be submitted directly through the online . Question(s) submitted by other methods will not be considered. All questions concerning this Proposal must be received no later than 12:00 PM, on Thursday, November 20, 2025. Inquiries should be identified by title, date, proposal number, and should be submitted and posted to Judson ISD Public Purchase site. Judson ISD will then forward all inquiries to the Architect. Inquiries sent in any other format will not be considered. Responses to vendor Q&A will be posted as an Addendum at least (72) hours priorto the Bid Closing date. ESTIMATED CONSTRUCTION BUDGET: Scope per campus Budget per campus Hopkins ES – HVAC Controls $423,010.38 Masters ES – Interior Lighting Upgrade $103,027.67 Judson MS – HVAC Controls $634,515.56 Judson HS – Boiler Replacement $519,603.00 Judson HS – Generator Replacement $508,670.30 Judson HS – HVAC Controls $1,293,769.79 Judson HS – Interior Lighting Upgrades $163,688.30 OVERALL TOTAL PROJECT BUDGET: $3,646,285.00

Post-Bid

Educational

$3,646,285.00

Public - County

Renovation

89

16

13

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
101
Bidding Soon
2,447
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2025

February 2, 2026

Project location map

Multiple Locations, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.