Published February 9, 2026 at 7:00 PM
Updated February 10, 2026
Site work and new construction of a mixed-use development in Asheville, North Carolina. Completed plans call for site work for a playground / park / athletic field; and for the construction of a playground / park / athletic field.
As of February 09, 2026, this project has not yet been awarded. A timeline for award has not yet been established. The Town of Woodfin invites sealed bids for construction at Silver-Line Park, including: Park recovery and replace4ment of storm-damaged amenities Riverbank stabilization and flood mitigation Construction of new public restrooms The project is funded in part through FEMA Public Assistance and Hazard Mitigation programs. All contractors must hold a valid North Carolina General Contractor's License. Question Deadline 11/26/2025 at 5:00 PM ET - All questions concerning this solicitation shall be submitted by email Adrienne Isenhower, Project Manager aisenhower@woodfin-nc.gov Responses to Questions Posted: 5:00 PM, December 5, 2025 (Town website) Estimated Start (Mobilization): March 2, 2026 The Project generally includes: Park Recovery - the park site suffered significant flooding damage as a result of Tropical Storm Helene that requires demolition, replacement, construction, or reconstruction of certain park features that will either restore/replace to pre-Helene conditions (eligible for FEMA Public Assistance reimbursement) or improve pre-Helene conditions (eligible for FEMA Hazard Mitigation reimbursement). Features within the scope of this Project include: a. Demolition: signage, grills, trash cans b. Replacement: signage, recreational amenities (grills, picnic tables, park seating, etc), plant material, utility service/supply connections c. Construction: grading, park pavilion d. Reconstruction: riverside embankment, wetlands, playground surface and amenities Work to be completed is fully detailed in the Park Recovery CONSTRUCTION PLANS and DETAILED SPECIFICATIONS. Riverbank Stabilization - for a section of the riverbank compromised during the storm event, the project envisions significant regrading and revegetation to mitigate against future flooding. Work to be completed is detailed in the Riverbank Stabilization CONSTRUCTION PLANS. Public Restrooms - construct permanent public restrooms. The structure comprises two separate entrances (mens/womens) with each side including toilet, sink, and hand drying equipment. Site work entails construction of a concrete walkway and stormwater control features as detailed in the Restroom CONSTRUCTION PLANS.
Post-Bid
Playgrounds / Parks / Athletic Fields
$115,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.