Renovation of a military facility in Enid, Oklahoma. Completed plans call for the renovation of a military facility.
Replace wiring harnesses on both circuits of the York Chiller, Model Number YC1V0157VA46VABBXTX and Serial Number SC WM565760. Replace drain and feed valves, and oil separator sight glasses on both circuits. The work requires removal of refrigerant, completion of repairs, recharging of the system, and restarting the unit. All work must be performed in accordance with the attached Statement of Work (SoW), and the contract will be awarded as a Firm Fixed Price based on a Low Cost/Technically Acceptable evaluation. The Contractor shall furnish all supervision, labor, equipment, consumable materials, supplies, tools and other items to complete the troubleshooting as listed in the scope of work. All quotes will include all shipping charges for completion of the project. The contractor shall coordinate all work with AFFS Construction Management before starting any work. The list of items below are to be considered the general scope of work for this project. The work covered under this statement of work shall consist of the following: A. REPLACE WIRING HARNESSES ON BOTH CIRCUITS ON CHILLER. replace drain and feed valves. replace oil separator sight glasses on both circuits. This will require refrigerant to be removed then repairs performed and system recharged and started. This quote only covers what is stated in scope any other faulty items will be at extra cost to customer. . Contractor shall schedule work in advance with the AFFS Construction Management. B. Contractor shall complete work on this contract with minimum interference to normal functions around this area. C. Contractor shall be responsible for establishing a schedule to meet construction time. D. Contractor shall develop, and submit a schedule indicating all work activities including required interruptions of utilities, facilities activities, or traffic flow to AFFS Construction Management for approval. E. Contractor shall coordinate his work with AFFS Construction Management to avoid interference with necessary activities within and adjacent to the construction site. The Contractorshall coordinate the work of all tradesto prevent any conflicts. The Contractor, before proceeding with the construction, shall resolve any conflicts of components.
Post-Bid
Military
$40,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 12, 2025
December 12, 2025
1601 W Fox Dr, Enid, OK
Related To This Project
Enid, OK
Bid Date: Dec 10 2025
Enid, OK
Bid Date: Nov 14 2025
Enid, OK
Bid Date: Nov 26 2025
Enid, OK
Bid Date: Dec 05 2025
Enid, OK
Bid Date: Dec 08 2025
Enid, OK
Bid Date: Dec 12 2025
Enid, OK
Bid Date: Jan 15 2026
Enid, OK
Bid Date: Nov 05 2025
Enid, OK
Bid Date: Nov 07 2025
Enid, OK
Bid Date: Nov 07 2025
Enid, OK
Bid Date: Oct 24 2025
Enid, OK
Bid Date: Oct 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.