BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

Renovation of a military facility in Enid, Oklahoma. Completed plans call for the renovation of a military facility.

Replace wiring harnesses on both circuits of the York Chiller, Model Number YC1V0157VA46VABBXTX and Serial Number SC WM565760. Replace drain and feed valves, and oil separator sight glasses on both circuits. The work requires removal of refrigerant, completion of repairs, recharging of the system, and restarting the unit. All work must be performed in accordance with the attached Statement of Work (SoW), and the contract will be awarded as a Firm Fixed Price based on a Low Cost/Technically Acceptable evaluation. The Contractor shall furnish all supervision, labor, equipment, consumable materials, supplies, tools and other items to complete the troubleshooting as listed in the scope of work. All quotes will include all shipping charges for completion of the project. The contractor shall coordinate all work with AFFS Construction Management before starting any work. The list of items below are to be considered the general scope of work for this project. The work covered under this statement of work shall consist of the following: A. REPLACE WIRING HARNESSES ON BOTH CIRCUITS ON CHILLER. replace drain and feed valves. replace oil separator sight glasses on both circuits. This will require refrigerant to be removed then repairs performed and system recharged and started. This quote only covers what is stated in scope any other faulty items will be at extra cost to customer. . Contractor shall schedule work in advance with the AFFS Construction Management. B. Contractor shall complete work on this contract with minimum interference to normal functions around this area. C. Contractor shall be responsible for establishing a schedule to meet construction time. D. Contractor shall develop, and submit a schedule indicating all work activities including required interruptions of utilities, facilities activities, or traffic flow to AFFS Construction Management for approval. E. Contractor shall coordinate his work with AFFS Construction Management to avoid interference with necessary activities within and adjacent to the construction site. The Contractorshall coordinate the work of all tradesto prevent any conflicts. The Contractor, before proceeding with the construction, shall resolve any conflicts of components.

Post-Bid

Military

$40,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
42
Bidding Soon
468
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

December 12, 2025

Project location map

1601 W Fox Dr, Enid, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.