Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 25, 2026 at 8:00 PM
Updated March 26, 2026
Renovation of an educational facility in Casselberry, Florida. Design plans call for the renovation of a educational facility.
As of March 5, 2026, this project is in the design phase. Design work for phase 1 is expected to last until December 2026 with construction from April 2027 to December 2027. Phase 2 design should take place from October 2026 to February 2027 with construction occurring in the summer of 2027. *Previous solicitation listed below for reference:* SCPS is seeking an architectural/engineering firm to provide design and construction administration services for the scope within the construction budget to be determined. Included with the architectural/engineering services will be the predesign effort to work with the Owner and Construction Manager at Risk with prioritizing the scope of work based on cost and phasing strategy. New Dining Facility and Renovations to Various Buildings at South Seminole Middle School . SCPS is seeking an architectural/engineering team to provide full design and construction administration services for the interior renovations to buildings 3 and 4, remodeling building 8 to provide improved circulation between the locker areas and the existing gymnasium, along with replacing buildings 1 and 7 with a new dining facility and office spaces. Short List meeting: 1/28/2026 9:00 AM SCPS - Educational Support Center 400 East Lake Mary Blvd Sanford, FL 32773-7127 Question Deadline 12/17/2025 at 10:00 AM ET The method of Contractor Selection has not been Determined at this time.
Design
Educational
$17,116,020.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2027
101 S Winter Park Dr, Casselberry, FL
Related To This Project
Casselberry, FL
Bid Date: Dec 16 2025
Casselberry, FL
Bid Date: Jan 08 2026
Casselberry, FL
--
Casselberry, FL
--
Casselberry, FL
--
Casselberry, FL
--
Casselberry, FL
--
Casselberry, FL
--
Casselberry, FL
Bid Date: Oct 14 2025
Casselberry, FL
Bid Date: Dec 18 2025
Casselberry, FL
Bid Date: Sep 22 2020
Casselberry, FL
Bid Date: Aug 07 2025
Casselberry, FL
Bid Date: Jul 09 2025
Casselberry, FL
Bid Date: Aug 18 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
