BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2026 at 7:00 PM

Updated March 1, 2026

Site work and paving for a road / highway in North Port, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

https://nflroads.com/ProjectDetails.aspxp=5539 Overview The asphalt resurfacing project consists of removing and replacing the upper layers of asphalt, asphalt grade adjustments, concrete pier protection installation at the overpasses, drainage improvements and rehabilitation, new highway signing and pavement markings, bridge rehabilitation, wrong-way detection system installation at the interchanges, guardrail replacement, concrete ditch pavement installation, rumble strip installation, and other incidental construction items from south of County Road 240 to State Road 47 as well as I-10 (State Road 8) to the Suwannee County line. Traffic will be maintained in accordance with FDOT design standards throughout the project. Drivers can expect nighttime, single-lane closures Monday through Friday during off-peak hours. ------------------------------------------------------------------------------------------------ District : 01 Prequalification Requirements : Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): Selection Method : Low Bid Financial Management Numbers : 45173415201 45173415202 Project Description : I-75 (SR 93) From SR 777 to SR 681 Project Manager : Felicia Pannell Contract Amount/Limit : $37,251,773.00 TRC Members (Subject to Change) : Alex Ruiz Kimberly Abate Melody Joyner The method of contractor selection has not been determined at this time. The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive Bids and Proposals from Bidders for SR 93/I-75 from SR 777 to SR 681 Resurfacing, Restoration, and Rehabilitation (RRR) to extend the service life of the existing roadway. Estimated Contract Time: 700 Days FDOT - RFP D/B - I-75 (SR 93) From SR 777 to SR 681 Question Deadline 02/20/2026

Post-Bid

Roads / Highways

$37,251,773.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
3
Bidding Soon
1,111
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

June 18, 2026

Project location map

I-75, North Port, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.