BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2026 at 7:00 PM

Updated January 10, 2026

Site work for a water / sewer project in Winlock, Washington. Completed plans call for site work for a water / sewer project.

**As of January 02, 2026, project is unofficially awarded to Rognlin's Inc. with the awarded amount of $806,760.00."" Project Description: This project includes work to upgrade and improve the City wastewater treatment plant (WWTP). The WWTP currently aerobically digests and thickens waste activated sludge (WAS) from the membrane bioreactor (MBR) to 2% via membrane thickening. The City intends to install a screw press, polymer system, and sludge pumps to dewater digested sludge. Due to limited sludge storage space, the City has little flexibility in additional wasting from the MBR process when digesters are full. The addition of dewatering equipment will provide plant staff with flexibility to waste additional sludge from the MBR process as the digester volume can be reduced by dewatering sludge to be stored within the existing covered drying bed and hauled away separately. As the process would be operated on an as-needed basis, no change to plant staffing levels is necessary. The WWTP has sludge drying beds onsite, which remain unused as the liquid sludge has too high of water content for the size of the drying beds. Dewatering equipment will be placed within the covered drying bed, at the southeast corner. Dewatered sludge will be discharged to a self-emptying hopper, which will be used to move dewatered sludge to storage piles within the existing covered drying bed. Stored dewatered sludge will be hauled offsite once per year to Fire Mountain Farms for land application For questions, contact the following via email: admin@jacksoncivil.com

Award

Water / Sewer

$806,760.00

Public - City

Site Work

155

72

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
120
Bidding Soon
1,206
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2025

January 26, 2026

Project location map

1209 SW Mayer St, Winlock, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.