Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 17, 2025 at 7:00 PM
Updated December 18, 2025
Site work for a water / sewer project in Cape Coral, Florida. Completed plans call for site work for a water / sewer project.
Bids for Installation & Testing of 10 Upper Floridian Aquifier Supply Wells Question Cuttoff Date & Time 11/26/2025 02:00:00 PM (ET) No questions will be accepted after and all questions must be submitted through Ion Wave Drilling and Testing of Ten UFA Water Supply Wells; site preparation, construction, development and testing of ten 12-inch diameter by approximately 800-foot-deep Water Supply Wells. Including, geophysical and video logging, specific capacity pumping test, acidization if determined necessary, post-acidization geophysical and video logging and specific capacity pumping test if acidization is performed, conducting 72-hour constant rate aquifer performance tests, preparation of as-builts and survey plats, installation of temporary wellhead flanges, fenced compounds and concrete pads for each well. Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: The Work to be performed shall consist of furnishing tools, equipment, materials, supplies, and manufactured articles, and furnishing all labor, transportation, and services, including but not limited to fuel, power, water, essential communications, and performing all Work or other operations required in strict accordance with the Drawings and these Specifications. The Work shall be complete, and all Work, materials, and services not expressly indicated or called forin the Contract Documents which may be necessary forthe complete and proper construction of the Work in good faith shall be provided by the Contractor as though originally so indicated, at no increase in cost to the City.
Bid Results
Water / Sewer
$6,390,400.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2025
February 16, 2026
Multiple Locations, Cape Coral, FL
Related To This Project
Cape Coral, FL
Bid Date: Jan 07 2026
Cape Coral, FL
--
Cape Coral, FL
Bid Date: Dec 19 2025
Cape Coral, FL
Bid Date: Dec 15 2025
Cape Coral, FL
--
Cape Coral, FL
Bid Date: Jan 29 2026
Cape Coral, FL
Bid Date: Dec 04 2025
Cape Coral, FL
Bid Date: Nov 21 2025
Cape Coral, FL
Bid Date: May 23 2019
Water Treatment Plant Refurbishment (Access Platforms, Pipe Supports, Grating and Coating) - 4277032
Cape Coral, FL
Bid Date: May 19 2021
Cape Coral, FL
Bid Date: Nov 13 2025
Cape Coral, FL
--
Cape Coral, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
