BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work, paving and outdoor lighting for a civil project in Homosassa, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; road / highway; and water / sewer project.

Counties: Citrus Road Name: Suncoast Ii-phase 3b (Sr589)-cr 495 to Us 19 - Limits: 02470000 Project(s): 44276435201(*) Federal Aid No: N/A Total Roadway Length: 4.496 Miles Contract Days: 1759 Total Bridge Length: 0.410 Miles Total Proposal Length: 4.906 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 90 Description: Work consists of providing all labor, materials, equipment and incidentals necessary for construction of SR 589 (Suncoast Parkway 2) from CR 495 to US 19 in Citrus County (02470), from milepost 75.707 to milepost 80.720. Other components of the project include roadway, drainage, signing and pavement markings, lighting, signalization, ITS bridge structures, and toll facilities. No Pre-Bid Conference. Contractor must be prequalified. For projects in excess of $50 million, in addition to meeting all other qualification requirements of Section 337.14, Florida Statutes, and Rule Chapter 14-22, Florida Administrative Code, any Contractor who is not prequalified and in good standing with the Department as of January 1, 2019, must submit evidence which demonstrates satisfactory completion of at least two projects, each in excess of $15 million, for the Florida Department of Transportation or for any other state department of transportation. Acceptability of the evidence related to the two projects is at the sole discretion of the Department Question Deadline 01/06/2026 at 5:00 PM ET, Direct all questions to the Department by posting them to the Department's website. Questions posted to this site before 5:00 P.M. (EST) on the tenth calendar day prior to the bid opening, will be responded to by the Department. For questions posted after this deadline, an answer cannot be assured. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 001 - Grading/Drainage - SR 589 (Suncoast Parkway 2)

GC Bidding

Roads / Highways

$191,956,655.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

1419

5

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
127
Bidding Soon
2,065
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2026

January 23, 2026

Project location map

FL-589, Homosassa, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.