BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Renovation of a data center facility in Los Angeles, California. Completed plans call for the renovation of a one-story above grade data center facility.

Provide all labor, materials, equipment, tools, transportation, insurance, and services to convert existing storage room into new telecommunication room (1699x). New IT Equipment and MEP Infrastructure. Walls and doors are existing. Hazardous Materials abatement will not be required. Only the following General Contractors have been prequalified to bid on this project as Prime Contractor: 2H Construction, DLS Builders, HHJ Construction, Interscape Construction, Parker Brown, POM Construction, Cannon Group. Bids will be received only from these contractors. The successful Bidder must have a current and active California contractor's license (B, General Contractor) at the time of bid submission. All bidders must attend a mandatory pre-bid conference and job walk in their entirety. Compliance with equal employment opportunity policy, nondiscrimination requirements, and prevailing wage laws is required. All contractors and subcontractors must be registered with the Department of Industrial Relations. A. General: The Work to be completed under this Contract shall be as shown, documented and set forth in the Contract Documents. The scope and demolition is defined in the Specifications and indicated on the Drawings. As defined in the Specifications, majority of the space shall be demolished with specific components salvaged, protected, stored and inventoried. Drawings reflect approximate extent of existing Tenant construction. Contractor is responsible for touring all levels of the existing space to determine existing conditions. This Contractor shall have the overall responsibilities for all of the Work specified here in Section 02 41 19. All Work normally defined as "Architectural Finish" and as listed as "Base Space Demolition" shall be completed by this Demolition Contractor. All Work normally defined as "Mechanical Systems" and as listed "Mechanical Space Demolition" shall be completed by a Mechanical Contractor under contract with this Contractor. All Work normally defined as "Electrical System" and as listed "Electrical Space Demolition," shall be completed by an Electrical Contractor under contract with this Contractor. The Contractor shall include in the scope of work "Salvaging" existing items to be reused or recycled in specific areas determined by the University and as called out on the plans. B. Base Space Demolition: Demolition includes, but is not necessarily limited to, the following: 1. Refer to Drawings for areas and scope of demolition. 2. Contractor shall review during the bld phase and include within the bid to remove old and abandoned wiring, cables, straps and duct that are above the celling. The ceiling can be accessed to view during the Bid period upon request by Bidders. C. Structure: Cut floor slab for new openings. Requires X-raying of decks to ensure avoidance of rebar and electrical conduit. D. Mechanical Space Demolition: Prior to all mechanical demolition, Contractor shall consult building engineer. (Refer to Drawings and other Specification Sections for additional requirements.) E. Electrical Space Demolition: All non-reusable data, phone and power wiring shall be removed above the ceiling and back to termination. It is mandatory that the building engineer and data/phone representative be contacted before commencement of such removal for verification purposes. (Refer to Drawings and other requirements in this Section for special conditions.) F. Salvage: The following items shall be carefully removed and stored neatly in area shown on the Drawing or as directed by the University's Representative. 1. Refer to drawings, notes and annotations found on: Demolition Plan, Symbols Legend, and in the Schedules for Doors, Windows, Hardware and Finishes. G. Codes: Conform to codes and requirements of governing authority. 1. Obtain and pay for all permits for demolition; protection of the public and property; transportation and disposal of debris; and capping of utility services. A. The full extent of metal fabrications work which may be required including items fabricated from iron and steel shapes, plates, bars, strips, tubes, pipes and castings which are not a part of structural steel or other metal systems in other sections of these specifications is not shown on the drawings. B. Types of work in this Section include metal fabrications for: 1. Rough Hardware 2. Loose Bearing and Leveling Plates 3. Miscellaneous and Framing Supports C. Related Work Specified Elsewhere: 1. Section 064023: Architectural Woodwork 2. Section 123500: Plastic Faced Casework 3. Section 099123: Painting

Post-Bid

Data Centers

$275,000.00

Public - State/Provincial

Renovation

31

24

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
521
Active Projects
250
Bidding Soon
3,715
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2025

January 9, 2026

Project location map

10920 Wilshire Boulevard 16th Floor, Los Angeles, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.