Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 8, 2025 at 7:00 PM
Updated December 9, 2025
Demolition, site work, paving, outdoor lighting and new construction of a civil project in Killen, Alabama. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; water / sewer project; and for outdoor lighting for a road / highway.
Lauderdale County Contract Time: 235 Working Days for constructing the Bridge Replacement (Grading, Drainage, Pavement, Traffic Lighting, and Bridge) on SR-2 (US-72) over SR-20 in Florence. Length 0.518 mi. The Bracket Estimate on this project is from $6,813,223 to $8,327,273 . If further clarification is needed, please contact the Plans and Proposals Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 02 - Bridge Replacement (Grading, Drainage, Pavement, Traffic Lighting, and Bridge) on SR-2 (US-72) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Bridges / Tunnels
$7,247,268.00
Public - State/Provincial
Demolition, New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2025
February 3, 2026
US-72, Killen, AL
Related To This Project
Killen, AL
--
Killen, AL
Bid Date: Sep 18 2025
Killen, AL
Bid Date: Feb 13 2025
Killen, AL
Bid Date: Aug 30 2024
Killen, AL
Bid Date: Aug 15 2024
Killen, AL
Bid Date: Jul 12 2024
Killen, AL
Bid Date: Jun 14 2024
Killen, AL
Bid Date: Apr 18 2024
Killen, AL
Bid Date: Jun 25 2019
Killen, AL
Bid Date: Jun 06 2023
Killen, AL
Bid Date: Apr 10 2023
Killen, AL
Bid Date: Jan 05 2021
Killen, AL
Bid Date: Mar 16 2023
Killen, AL
Bid Date: Mar 07 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
