Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 30, 2025 at 7:00 PM
Updated January 1, 2026
Site work for a transportation facility in Chicago, Illinois. Working plans call for site work for a transportation facility.
https://chicago.suntimes.com/transportation/2025/12/02/ohare-global-terminal-construction-american-united Over the last year, O’Hare International Airport unexpectedly came to dominate U.S. passenger growth as United Airlines and American Airlines shifted more flights to the Midwestern hub. That apparent good news for O’Hare has unexpectedly thrown a wrench in the city’s plan to build new terminals over the next several years. With O’Hare terminal capacity at the brink, the city says it cannot afford to close Terminal 2 to build a massive Global Terminal by 2033. Now city planners want to scrap the current construction schedule for terminal expansion set to cost most than $8 billion. In a bond statement published in November, the city says it is negotiating with airlines about changing the sequencing of which terminals are built first. The city and airlines agreed in 2024 to build one satellite terminal first, then build the global terminal, and then build the second satellite terminal only if there was enough money left. The city now says that schedule is not possible. Instead, it wants to build both satellite terminals by 2029, and then build the Global Terminal from 2029 to 2033, according to details in the bond statement. “The City’s analysis subsequently determined construction of the [Global Terminal] would need to be completed in incremental phases to mitigate gate capacity impacts... . As such, the City is continuing to engage with stakeholders and evaluate the most advantageous phasing,” the city stated. A new plan needs to be agreed upon by the airlines and the city. The Chicago Department of Aviation, in a statement, said it is “is advancing a development framework to guide the current phase of construction and minimize operational impacts. This framework will continue to be refined through active collaboration with airline partners. Future adjustments to project sequencing and timing will reflect our shared commitment to a smooth, efficient, and forward-looking modernization of O’Hare.” United Airlines declined to comment. American airlines did not immediately respond to a request for comment. Joe Schwieterman, director of DePaul University’s Chaddick Institute for Metropolitan Development, said the previous construction timeline has serious problems. He said he plans to publish a report Wednesday explaining the capacity issues the city must address in a new construction plan. The city and airlines must look again at the project’s sequences, since building the project in phases is so costly, he said. “The city needs to present an analysis to convince the airlines there’s a better way. The difficulty is what prevented the existing plan. It was deemed too costly. And let’s hope that’s still not the case,” he said. One potential problem with the city’s revised plan — building the two satellite terminals first before the Global Terminal — is that if there’s an economic recession or air travel crisis, the city could find itself in heavy debt, he said. -------------------------- Aecom Hunt Clayco Bowa Jv Notice of Construction Prequalification Ohare International Airport - Concourse D Project Potential Prime Subcontractors Are Required to Prequalify Prior to Submission of a Bid Proposal. Effective 09/20/24 Aecom Hunt Clayco Bowa Has Partnered With Bespoke Metrics to Utilize Compass as the Prequalification Platform for All Bid/trade Packages Associated With the Upcoming Concourse D Project and Related Airport Improvements. For Additional Information Regarding Prequalification, Contact Concoursed@ahcjv.com The method of Contractor Selection has not been Determined at this time.
Final Planning
Transportation Terminals
$600,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 10, 2026
10000 W O'Hare Ave, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Nov 25 2025
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Jan 16 2026
Chicago, IL
Bid Date: Jan 16 2026
Chicago, IL
Bid Date: Nov 25 2025
Chicago, IL
Bid Date: Jan 16 2026
Chicago, IL
Bid Date: Nov 24 2025
Chicago, IL
Bid Date: Nov 20 2025
Chicago, IL
Bid Date: Dec 02 2025
Chicago, IL
Bid Date: Nov 20 2025
Chicago, IL
Bid Date: Jan 13 2026
Chicago, IL
Bid Date: Nov 18 2025
Chicago, IL
Bid Date: Dec 02 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
