Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 18, 2026 at 7:00 PM
Updated November 24, 2026
Site work for a transportation facility in Chicago, Illinois. Completed plans call for site work for a transportation facility.
https://www.dailyherald.com/20261112/transportation/how-to-navigate-ohare-tightrope-through-7-year-makeover-depaul-has-tips/ O’Hare has 7 years of construction ahead of it. DePaul has tips on how to make it easier for travelers An American Airlines plane taxis on its way to a runway near Terminal 5 at O'Hare International Airport on Oct. 17, 2026. (Eileen T. Meslar/Chicago Tribune) To avoid seven years of construction dysfunction, O’Hare International Airport needs creative strategies to lessen the impact of a building boom on passengers, a new DePaul University study finds. The report notes that the city trails behind other U.S. airports in terms of major upgrades and cautions that “O’Hare treads a tightrope” during its ORDNext remake. ORDNext, expected to take until 2034, includes construction of a Global Terminal, which will replace Terminal 2, and two new concourses. “O'Hare is an outlier among the top 25 airports in the U.S., and globally, for not building a large new concourse or terminal in the last 25 years,” said aviation expert and DePaul Professor Joseph Schwieterman. “The next seven years, including busy holiday weekends, will be pretty stressful.” A Chicago Department of Aviation spokesperson noted, “ORDNext builds on the O'Hare Modernization Program, a 16-year effort completed in 2021 that transformed the airfield into a modern system of eight runways, the most of any commercial airport in the world. “Minimizing construction impacts on the passenger experience remains central to how CDA plans and delivers ORDNext.” To ensure construction stays on time, one solution could be modular construction, or building sections of the terminal off-site, DePaul researchers recommended. Another innovation would be mobile boarding platforms that eliminate having planes taxiing around, the report suggests. The vehicles are essentially battery-powered waiting areas on wheels that take passengers to and from the terminal to their plane. Portions of Terminal 2 and Terminal 3 date back to 1962, DePaul researchers said, pointing to new terminals at Atlanta Hartsfield-Jackson Airport and Dallas/Fort Worth International Airport that opened in 2012 and 2005, respectively. Work has started on Concourse D, which will finish in late 2028. The first phase of Concourse E begins later this year and finishes in 2030. Construction of the Global Terminal kicks off in 2029 and should end in 2033. That will trigger the second phase of Concourse E, which should open in 2034. The key for the Chicago Department of Aviation will be to keep sufficient gates in operation amid competition between American and United airlines to offer more flights, the report said. A United Airlines jet pulls back from its gate at O’Hare International Airport on Oct. 14, 2026. (Stacey Wescott/Chicago Tribune) United will face the bigger challenge because it relies more heavily on Terminal 2, which will be demolished, the report notes. Although passenger satisfaction ratings have consistently risen at O’Hare, its 2026 score of 585 falls below the average of 621 in JD Power rankings. The report also notes average taxi times for outbound flights at O’Hare are 28.3 minutes compared to 20.8 minutes at 30 other major airports; inbound flights average 19.8 minutes of taxiing compared to 10.5 minutes elsewhere. “O'Hare has a great deal of momentum right now, so it is critical that timelines for construction upgrades be met,” Schwieterman said. The CDA said it is working with the Federal Aviation Administration and airlines to address taxi times and other issues. The specific recommendations in the report “would require detailed operational and engineering evaluation in consultation with our airline, federal and construction partners,” the agency said. ------------------------------------------------------------------------------------------------------------------ https://www.dailyherald.com/20261011/transportation/frustration-boils-over-as-perfect-storm-causes-more-delays-after-landing-at-ohare/ Frustration boils over as ‘perfect storm’ causes more delays after landing at O’Hare Lots of rock-solid names have been suggested for a giant boulder unearthed in June during construction at O’Hare International Airport. But Joseph Kolar’s idea skips the puns and makes a point. “The rock should be called: ‘Our gate is occupied,’” he told the Daily Herald. “For at least a year, every time we land at O’Hare, the pilot announces: ‘The good news is we are early. The bad news is that our gate is occupied.’ Our plane then drives around O’Hare for 30 to 60 minutes,” Kolar explained. The inconvenience typically occurs when the Libertyville resident flies home from Phoenix on United or American airlines. “It is terrible. We are thinking of flying out of Midway to Phoenix,” Kolar noted. Asked about the gate delays, aviation expert and DePaul University Professor Joseph Schwieterman said it’s not an isolated glitch. “Delays for arriving planes and long taxi times are a one-two punch to travelers. Many trips that are proceeding smoothly end with a thud due to these problems,” Schwieterman said. The dysfunction seems to have gotten worse since Labor Day, he added, noting that “one of O'Hare's major problems is that some gates are too small to be used by big planes, making it akin to a giant jigsaw puzzle.” For context, O’Hare is now the busiest airport in the U.S. for operations, with United and American in a heated rivalry to expand service. Add to the mix — the city is in the midst of an ambitious $8.8 billion ORDNext megaproject. Workers are currently building Concourse D, a 19-gate structure on the southwest end of the airfield that will be completed in late 2028. Later this year, construction will begin on the first phase of Concourse E, and officials will break ground on a massive Global Terminal replacing Terminal 2 in 2029. CDA Director of Communications Kevin Bargnes explained Thursday that “all runway and taxiway work at O'Hare with the potential to significantly affect taxi times has been completed, and the ORDNext expansion program has been phased to minimize disruption to airfield operations. “Aircraft accessing certain gates must taxi around the construction site for the new Concourse D, but that additional taxi time is limited.” Bargnes noted that, as at other major U.S. airports, taxi times at O’Hare are influenced by a variety of factors, including airline schedules, air traffic control staffing, gate availability, weather, and the runways in use and their distance from assigned gates. “The additional gate capacity planned through ORDNext will give airlines greater operating flexibility and help ease gate-related congestion,” he said. United officials said the airline is “constantly working with ways to partner with the city to get creative solutions and be transparent with our customers,” adding they realize it’s frustrating for passengers. But taxi times continue to be problematic because of airfield construction, especially with recent concrete pouring for Concourse D, which has impacted aircraft movement, they noted. Related challenges like taxiway resurfacing and reconfigurations, as well as extreme weather this summer and runway reassignments have created “a perfect storm,” officials explained. Schwieterman noted that “recent flight cuts mandated by the FAA are no doubt helping, but more needs to be done to help O'Hare be more efficient.” American Airlines said Sunday the carrier “is committed ?to investing in Chicago ?and ?delivering a ?reliable ?experience ?for ?our ?customers at O'Hare and across ?our network. While ?O'Hare ?has faced operational challenges this summer, ?including significant ?thunderstorms and ?lengthy taxi times, ?the ?Federal Aviation Administration's order ?has helped mitigate ?what would ?otherwise have ?been ?even ?greater ?disruption.” American is collaborating with the CDA and FAA, noted officials, who commended ORDNext improvements. To offset delays, the airline has worked to mitigate disruptions by better communications with O’Hare air traffic control, expediting towing aircraft from gates, and adjusting schedules to prevention congestion. Got a comment or question? Drop an email to mpyke@dailyherald.com. One more thing Speaking of O’Hare, the CDA and Volaris Airlines debuted nonstop flights between Chicago and Hermanos Serdán International Airport in Puebla, Mexico, last week. The new service will operate on Tuesdays, Thursdays and Saturdays. Gridlock alert Drivers in the Northbrook area should brace for lane reductions starting this week on the Waukegan Road Bridge over the Edens Spur (I-94), the Illinois tollway announced Friday. It’s part of a larger bridge repair project that will wrap up later this fall. In addition to the Waukegan Road Bridge, long-term shoulder closures and short-term lane closures on I-94 are scheduled. ------------------------------------------------------------------------------------------------------------------------- https://www.constructiondive.com/news/manage-ohare-airport-infrastructure-project-construction-newbie/831008/ ORD Next, the approximately $8.8 billion capital project that will completely transform Chicago’s O’Hare International Airport, is a massive undertaking. It will see construction crews add two new concourses and double the size of a new terminal at the airport. Although the expansion will streamline traffic through the hub — the busiest airport in the world by airplane takeoffs and landings — it presents a challenge for construction crews. They need to pull off the colossal upgrade while minimizing disruptions at O’Hare. That’s a problem Zach Baughman, chief development officer and managing deputy commissioner of the Chicago Department of Aviation, has thought long and hard about. ___________ https://simpleflying.com/chicago-ohare-global-terminal-modernization-project/ Chicago O'Hare International Airport (ORD) handles over 80 million passengers per year through a terminal complex that has not received a major capital investment in more than 25 years. The O'Hare 21 modernization program, approved in 2018 with an $8.5 billion budget that has since grown to approximately $12 billion in current dollars, is designed to replace, expand, and modernize the airport's passenger facilities over a construction period that now extends to 2034. The program includes a new 2.2 million square foot (204,387 square meters) Global Terminal, two satellite concourses, an underground tunnel system, and renovations to existing terminals. The Terminal 5 expansion, the first major component, was completed in 2023 and added 10 new widebody gates and 25% more international capacity. Satellite Concourse 1 began vertical construction in April 2026. The Global Terminal, designed by Chicago architect Jeanne Gang, will follow. Here is what each project involves, how they fit together, and why the timeline has doubled from the original eight-year target to sixteen. What O'Hare 21 Is And Why The Airport Needs It O'Hare 21 project render Credit: OHare 21 | Simple Flying Chicago O'Hare International Airport is one of the busiest airports in the United States, handling over 80 million passengers annually. Terminal 2, the facility at the center of the redevelopment program, dates to the early 1960s. Terminal 1 was redesigned by architect Helmut Jahn and reopened in 1987 as the United Airlines terminal. Terminal 3, which serves primarily as American Airlines' domestic terminal, has received incremental updates over the decades but no comprehensive rebuild. Terminal 5, the international terminal, was built in 1993. The infrastructure passengers move through at O'Hare was designed across different eras, and the oldest portions predate modern security screening requirements, current widebody aircraft gate standards, and the hub-and-spoke traffic volumes the airport now handles. The O'Hare 21 program was approved in 2018 with an $8.5 billion budget to modernize the airport's terminal complex over approximately 15 years. The program covers three major components: the expansion and modernization of Terminal 5, the Terminal Area Plan that includes a new Global Terminal and two satellite concourses, and the completion of Runway 9C-27C as part of the broader O'Hare Modernization Program. The runway work was finished in 2020, capping a $6 billion, 16-year airfield reconfiguration that replaced O'Hare's legacy runway layout with parallel runways. The city reported a 64% reduction in delays over the life of the runway project. The terminal work is the remaining and most visible portion of the program. The $8.5 billion figure represents the 2018 authorization, and current estimates place the total program cost closer to $12 billion after inflation and scope adjustments. Robert Hoxie, Chief Development Officer at the Chicago Department of Aviation, described O'Hare 21 as "a generational capital investment in O'Hare's facilities that will take approximately 15 years to put in place." The airport's role as a connecting hub for both United Airlines and American Airlines, which together operate the majority of O'Hare's daily departures, makes the modernization a national infrastructure priority as well as a local one. The O'Hare Global Terminal ohare-global-terminal-chicago-airport-architecture-aerial (1) Credit: Studio Gang The Global Terminal is the centerpiece of the O'Hare 21 program and the most architecturally ambitious component. Designed by Chicago architect Jeanne Gang and her firm Studio Gang as part of a team called Studio ORD, which includes Solomon Cordwell Buenz, Corgan, Milhouse Engineering and Construction, and STLarchitects, the terminal won an international design competition that attracted submissions from firms worldwide. At 2.2 million square feet (204,387 square meters), it will more than double the size of the Terminal 2 it replaces and become one of the largest terminal buildings in the United States. NEW Catch what other flight trackers miss Emergency squawks, holds, NOTAMs — live signals, no signup. Open tracker ? The design uses a Y-shaped plan inspired by the three branches of the Chicago River, with three converging volumes meeting at a central hub. At the center, a dramatic Oculus sits beneath a six-pointed glass skylight referencing the Chicago flag. The roof structure uses long-span steel trusses clad in wood, with the spacing and orientation of the pleated ceiling panels designed to maximize natural daylight. The interior includes groves of trees, natural wood finishes, and an environment that Studio Gang has described as establishing "a vibrant new neighborhood in the heart of O'Hare's campus." The terminal will house both international and domestic operations for United Airlines and American Airlines, with its own customs and immigration checkpoint allowing both carriers and their alliance partners to process international arrivals without routing passengers through Terminal 5. British Airways Will Pay Pilots $100,000 A Year To Taxi At Chicago O'Hare Play Video 3:41 The design-build contract was awarded to a joint venture led by Clark Construction and Clayco. Work on the existing Terminal 2 is scheduled to begin in 2026, with demolition proceeding after flights are relocated to the satellite concourses. The Global Terminal's completion is currently targeted for 2032, though the overall program timeline has been pushed to 2034. The $2.2 billion terminal represents the largest single component of the O'Hare 21 budget and the project that will most visibly transform the passenger experience at the airport when it opens. United Airlines 737-700 Related United Airlines Pilots Mistook Runway Centerline At Chicago O’Hare, Damaging Edge Lights A United Airlines Boeing 737-700 Causes Damage To Runway Lights At ORD After Reportedly Incorrectly Lining Up With Runway Incorrectly. 1 By Josh Eyre The Satellite Concourses And The Underground Tunnel new-concourse-d-feature Credit: O'hare 21 The two satellite concourses are being built west of the existing terminal complex and will provide approximately 1.3 million square feet (120,774 square meters) of new gate and amenity space. Both concourses will serve international and domestic passengers and connect to the Global Terminal through an underground tunnel system. The concourses are separate buildings from the main terminal, which means passengers will move between the Global Terminal and the satellites via the tunnel rather than through a continuous above-ground connection. The satellite model is common at large international airports, including Atlanta, Denver, and Kuala Lumpur, but is new to O'Hare. Satellite Concourse 1, designated Concourse D, was designed by Skidmore Owings and Merrill and Norviska. The $1.45 billion facility began vertical construction in April 2026 with a targeted completion date of late 2028. Mayor Brandon Johnson and the Chicago Department of Aviation unveiled the concourse design in November 2025, describing it as one of the largest components of the O'Hare 21 program. The concourse will be the first major new terminal building to open at O'Hare under the program and will serve as the initial relocation point for flights currently operating from Terminal 2, which must be vacated before demolition can begin to make way for the Global Terminal. View this post on Instagram The construction sequence changed in May 2024 when Mayor Johnson and the airlines reached an agreement to adjust the original timeline. The 2018 plan called for building both satellite concourses and the connecting tunnel first, then constructing the Global Terminal after Terminal 2 was demolished. The revised sequence builds Satellite Concourse 1 first, then the Global Terminal, with the second satellite concourse built last. The change pushes the overall program completion from 2032 to 2034 but allows the first satellite to open earlier and begin absorbing Terminal 2 traffic sooner. The second satellite concourse has not yet received a public design unveiling or a firm construction start date. Terminal 5 Expansion And Terminal 3 Renovation United Airlines At ORD Credit: Shutterstock The Terminal 5 expansion is the only major terminal project under O'Hare 21 that is already complete. Construction began in March 2019, continued through the pandemic, and finished in 2023. The $1.2 billion project, led by the Austin Power Partners joint venture and designed by HOK and GFT (formerly Muller and Muller), added approximately 350,000 square feet (32,516 square meters) of new space and renovated 750,000 square feet (69,677 square meters) of the existing building. Terminal 5 opened in 1993 as O'Hare's international terminal and had not received a major expansion in the 30 years before the project began. The expansion added 10 new widebody gates with a flexible configuration that allows the concourse to shift between 10 widebody positions and 15 narrowbody positions depending on the aircraft mix. The new gates separate arriving international and domestic passengers into two streams, allowing the concourse to handle both types of flights simultaneously without mixing secured and unsecured passenger flows. Passenger amenity areas grew by 75%, and a $3.5 million art program integrated installations by local artists throughout the arrivals and departures areas. The Terminal 5 expansion increased O'Hare's international gate capacity by 25% and now delivers the highest gate utilization of any terminal at the airport. Terminal 3, which serves primarily as American Airlines' domestic terminal, is being renovated under the ElevateT3 program at a cost of approximately $300 million. The project received $90 million in FAA Airport Terminal Program grants across 2023 and 2024. The renovation updates the interior finishes, passenger amenities, and infrastructure of a terminal that dates to the original O'Hare construction era. Unlike the Global Terminal and satellite concourses, which are new-build projects, ElevateT3 is a modernization of an existing facility that will continue operating in its current role after the renovation is complete. United Airlines 737-700 Related United Airlines Pilots Mistook Runway Centerline At Chicago O’Hare, Damaging Edge Lights A United Airlines Boeing 737-700 Causes Damage To Runway Lights At ORD After Reportedly Incorrectly Lining Up With Runway Incorrectly. 1 By Josh Eyre Why The Timeline Has Slipped From 2026 To 2034 O'Hare Airport ORD - Chicago, Illinois - Aerial view of the runways and terminals of O'hare airport outside of Chicago Credit: Shutterstock When the O'Hare 21 program was approved in 2018, the target completion date was 2026. That timeline assumed construction of both satellite concourses and the connecting tunnel would begin in 2022, followed by demolition of Terminal 2 and construction of the Global Terminal, with the entire program wrapping up within eight years. The FAA's environmental review took four years, with approval granted in November 2022. Construction of the satellite concourses did not begin until after that approval, pushing the start of the terminal area work two years beyond the original schedule before a single foundation was poured. The sequencing change agreed upon in May 2024 between Mayor Johnson and the airlines added further time. The original plan built both satellites and the tunnel simultaneously, then the Global Terminal. The revised plan builds Satellite Concourse 1 first, then the Global Terminal, then the second satellite. Building in sequence rather than in parallel extends the overall timeline but reduces the peak capital expenditure in any single year and allows each phase to be completed and occupied before the next begins. The trade-off is that the program now takes 16 years from approval to completion rather than eight, with the current target set at 2034. The $8.5 billion authorization was set in 2018 dollars with explicit escalation language built into the funding structure. Inflation, material cost increases, and scope adjustments since 2018 have pushed the current-dollar estimate for the full program to approximately $12 billion. In March 2024, the Chicago Department of Aviation announced that it had identified $1.5 billion in cost-saving measures, including engineering and design efficiencies, which the department said would allow the program to move forward within its original budget framework despite the escalation. The program is funded through airline fees and airport revenue bonds rather than general tax revenue, meaning the cost is ultimately borne by passengers through ticket prices and airlines through their use agreements with the airport. ----------------------- https://news.wttw.com/2026/07/02/chicago-aviation-commissioner-looks-ahead-airport-expansion-plans-take Love them or hate them, Chicago’s O’Hare and Midway airports operate around the clock to keep people and goods moving around the globe. Managing it all, from the runways to the restaurants, is the city’s Department of Aviation. With this constant movement comes constant challenges. The airports that have served Chicago for decades need to upgrade services for the future, while still meeting the needs of today’s passengers. Last year, O’Hare broke ground on Concourse D, its first new concourse in more than 30 years. And that’s just one part of the $8.8 billion expansion plan at the airport. Meanwhile, the Federal Aviation Administration announced this spring it would cut around 300 daily flights from O’Hare this summer. Still, that airport is expected to break records this holiday weekend, while Midway continues its upward trajectory of passengers. Chicago’s Department of Aviation Commissioner Michael McMurray joined “Chicago Tonight” to discuss his first year in the role, O’Hare expansion plans and more. On his first year in the role: “I have a background in government — in aviation and procurement — as well as a background in construction in the private sector. So (I bring) a strong understanding of how these fields align, and what good collaboration looks like between the public sector and private sector.” “This is a business of collaboration, and I’ve received all the support that I need from the mayor’s office and our airline partners — both at O’Hare and Midway Airports. … We all understand how critical O’Hare is to the national aviation system. And we all understand how important it is to continue to invest in our airport system.” On O’Hare expansion plans: “Right now at O’Hare, we have our capital improvement project going on. That’s ORD Next, the $8.8 billion capital improvement program, which consists of two new concourses and a global terminal, which is the centerpiece of the program itself.” “The construction project launched last summer. We broke ground on our Concourse D this past fall, and that Concourse D is $1.4 billion. It consists of 590,000 square feet, 19 new gates, more comfortable and modern spaces for passengers, greater flexibility across aircraft types. It’s about smoother connections between domestic and international flights, particularly for our hub carriers.” “Our airline partners (are paying for it). … At O’Hare and Midway, we’re very grateful for the investments that both of our major airlines, American and United — our hometown airline — have continued to make at our airport there, and over the years. And at Midway, it’s Southwest Airlines.” On FAA cuts to service: “First and foremost, the restriction on flights, … they’re temporary, and they only last through October of this year. And they still allow for growth when you look at last summer, compared to this summer.” “The Department of Aviation feels that we are able to efficiently, and safely, operate the airfield without any artificial restrictions or limitations on the market. At the end of the day, all parties agree that O’Hare is so critical to the national aviation system that it deserves the highest levels of air traffic controllers, training procedures and infrastructure needed to make sure that we continue to grow.” -------------------------------- https://www.constructiondive.com/news/illinois-i-80-bridge-des-plaines/821527/ Earlier this month, a key portion of a massive overhaul of Interstate 80 in Illinois broke ground. State officials and a building team of Coal City, Illinois-based D Construction and Kansas City, Missouri-based HNTB began work on new I-80 bridges over the Des Plaines River, according to an announcement from Gov. JB Pritzker’s office. The $164 million spans will replace structures originally built in the 1960s, according to the announcement. These new, concrete bridges will be located 300 feet to the north and will be wider than the previous spans. The new bridges are expected to be complete in 2028, with the old bridges scheduled for demolition in 2029. All told, the crossings are the centerpieces of a $1.3 billion effort to modernize and rehabilitate I-80 in Illinois, a critical thoroughfare that serves as one of the country’s three coast-to-coast highways. The highway begins in San Francisco and ends in New Jersey. The overall I-80 rehab in Illinois will see construction teams redesign and rebuild 16 miles of the highway, from Ridge Road in Minooka to U.S. 30 in Joliet and New Lenox, according to the announcement. “This milestone represents significant progress on one of the most important infrastructure investments in our region,” said Terry D’Arcy, mayor of Joliet, Illinois, in the May 22 release. “The reconstruction of the Des Plaines River bridge and surrounding I-80 corridor will strengthen a critical transportation route that serves residents, businesses, and commerce throughout the country.” The city of Joliet benefits mightily from I-80 traffic — the interstate carries approximately 80,000 vehicles a day, about 25% of which are trucks, through the city, according to the announcement. The value of freight passing through surrounding Will County is over $600 billion annually. In October, Illinois committed approximately $50.6 billion to infrastructure improvements across the state. Of that money, $32.5 billion is earmarked for roads and bridges, and $18.1 billion is set aside for transit, rail, aviation, ports and waterways. In particular, the city of Chicago has been busy on the infrastructure front. An AECOM Hunt Clayco Bowa joint venture and the Chicago Department of Aviation recently started vertical construction on O’Hare International Airport’s new, $1.45 billion Concourse D project. Contractors also broke ground on the $5.7 billion Red Line Extension, which will bring rapid rail transit to Chicago’s Far South Side neighborhood. ---------------------------------------------------------------------- https://chicago.urbanize.city/post/full-building-permit-issued-ohare-concourse-d A full building permit has been issued for the construction of The New Concourse D at O’Hare International Airport, set to be constructed adjacent to the current Terminal 1 Concourse C. Designed by the Chicago-based firm of Skidmore, Owings & Merrill, in collaboration with Ross Barney Architects, Juan Gabrel Moreno Architects, and Arup, The New Concourse D will introduce 19 new flexible gates built to serve today’s modern aircraft. Each position will be capable of accommodating either two narrow-body aircraft or one wide-body aircraft, boosting overall capacity while maximizing gate utilization. At the northern end of the 590,000-square-foot Concourse D is a 40-foot-high atrium-like space connecting the building’s three levels, marked by an oculus that directs daylight into the levels below, offering a warm, inviting, and well-landscaped seating area for travelers to enjoy. The building will feature tree-like structural columns, an elegant and functional design element, which also serve as a subtle nod to the apple orchard that once stood on the site where O’Hare now stands. At the south end of the concourse, views will look out towards the downtown Chicago skyline from what has been dubbed the Skyline Garden. The $1.3 billion Concourse D project broke ground in 2025 as the first part of ORDNext, the redevelopment plan that includes The New Concourse D, The New Concourse E, and the O’Hare Global Terminal, all connected by an underground tunnel system. The broader ORDNext program will deliver 14 percent more gate capacity, greater flexibility for hub carriers, and more lounges and amenities, all while improving operational efficiency. Construction crews at the Concourse D site are working daily, driving caissons, hoisting cranes, and installing structural steel. With the caisson permit, foundation permit, tower crane permit, and now the full building permit all in hand, joint venture general contractor AECOM Hunt Clayco Bowa has all the permits necessary to continue work through completion. The New Concourse D is scheduled for completion in late 2028. __________________________________________________________________________________________________ https://chicagoyimby.com/2026/02/new-renderings-revealed-for-concourse-d-at-ohare-international-airport.html New Renderings Revealed For Concourse D At O’Hare International Airport 7:45 am on February 7, 2026 By Ian Achong Additional renderings have been revealed as part of a new fly-through video of the upcoming Concourse D at O’Hare International Airport. The new concourse marks the first major expansion at the airport since the Terminal 5 expansion was completed in 2023. It is also the first phase of the overall ORDNext project and is expected to be completed in 2028. ____________________________________ https://chicago.suntimes.com/transportation/2025/12/02/ohare-global-terminal-construction-american-united Over the last year, O’Hare International Airport unexpectedly came to dominate U.S. passenger growth as United Airlines and American Airlines shifted more flights to the Midwestern hub. That apparent good news for O’Hare has unexpectedly thrown a wrench in the city’s plan to build new terminals over the next several years. With O’Hare terminal capacity at the brink, the city says it cannot afford to close Terminal 2 to build a massive Global Terminal by 2033. Now city planners want to scrap the current construction schedule for terminal expansion set to cost most than $8 billion. In a bond statement published in November, the city says it is negotiating with airlines about changing the sequencing of which terminals are built first. The city and airlines agreed in 2024 to build one satellite terminal first, then build the global terminal, and then build the second satellite terminal only if there was enough money left. The city now says that schedule is not possible. Instead, it wants to build both satellite terminals by 2029, and then build the Global Terminal from 2029 to 2033, according to details in the bond statement. “The City’s analysis subsequently determined construction of the [Global Terminal] would need to be completed in incremental phases to mitigate gate capacity impacts... . As such, the City is continuing to engage with stakeholders and evaluate the most advantageous phasing,” the city stated. A new plan needs to be agreed upon by the airlines and the city. The Chicago Department of Aviation, in a statement, said it is “is advancing a development framework to guide the current phase of construction and minimize operational impacts. This framework will continue to be refined through active collaboration with airline partners. Future adjustments to project sequencing and timing will reflect our shared commitment to a smooth, efficient, and forward-looking modernization of O’Hare.” United Airlines declined to comment. American airlines did not immediately respond to a request for comment. Joe Schwieterman, director of DePaul University’s Chaddick Institute for Metropolitan Development, said the previous construction timeline has serious problems. He said he plans to publish a report Wednesday explaining the capacity issues the city must address in a new construction plan. The city and airlines must look again at the project’s sequences, since building the project in phases is so costly, he said. “The city needs to present an analysis to convince the airlines there’s a better way. The difficulty is what prevented the existing plan. It was deemed too costly. And let’s hope that’s still not the case,” he said. One potential problem with the city’s revised plan — building the two satellite terminals first before the Global Terminal — is that if there’s an economic recession or air travel crisis, the city could find itself in heavy debt, he said. -------------------------- Aecom Hunt Clayco Bowa Jv Notice of Construction Prequalification Ohare International Airport - Concourse D Project Potential Prime Subcontractors Are Required to Prequalify Prior to Submission of a Bid Proposal. Effective 09/20/24 Aecom Hunt Clayco Bowa Has Partnered With Bespoke Metrics to Utilize Compass as the Prequalification Platform for All Bid/trade Packages Associated With the Upcoming Concourse D Project and Related Airport Improvements. For Additional Information Regarding Prequalification, Contact Concoursed@ahcjv.com The method of Contractor Selection has not been Determined at this time.
Under Construction
Transportation Terminals
$600,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 18, 2026
10000 W O'Hare Ave, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Nov 25 2025
Chicago, IL
--
Chicago, IL
Bid Date: Jun 12 2026
Chicago, IL
--
Chicago, IL
Bid Date: Jan 16 2026
Chicago, IL
Bid Date: Jan 16 2026
Chicago, IL
Bid Date: Nov 25 2025
Chicago, IL
Bid Date: Nov 24 2025
Chicago, IL
Bid Date: Nov 20 2025
Chicago, IL
Bid Date: Dec 02 2025
Chicago, IL
Bid Date: Nov 20 2025
Chicago, IL
Bid Date: Jan 13 2026
Chicago, IL
Bid Date: Nov 18 2025
Chicago, IL
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed