Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 10, 2025 at 7:00 PM
Updated December 4, 2025
This is a service / maintenance or supply contract in Redlands, California. Contact the soliciting agency for additional information.
• Main line sewer replacement in various sizes using SDR-35 pipe. Replace all existing laterals in the replaced line in a minimum of 5’ length of in kind size with SDR-35 pipe using Fernco transition rubber, or equal; • Main line sewer spot repair in various sizes using SDR-35 pipe. Each spot repair will consist of a total of 19’ of one size of pipe divided into various sizes for repairs in close proximity to one another; • Manhole invert flow line repair; • Manhole ring and cover repair and replacement. City to provide manhole ring and cover. • Uncover and raise manholes to street level; • Perform sewer bypass. Contractor to furnish all equipment, perform traffic control, perform set up/ take down and maintain the bypass through the entire duration; • Provide proper supervision and appropriate traffic control at the job site during all phases of work; • Unit price to include all staff, material, equipment, supplies, and other associated costs; • Perform all repairs, replacements, and installations to meet City Standards and Specifications; • All affected streets, sidewalk, and other above ground areas are to be restored in accordance with the City’s general permit conditions and trench specifications located on the City’s website; • All work to be performed in a safe manner, using the appropriate personal protective equipment and in accordance with the City’s safety practices and job specific contractor requirements; • Upon request, prepare, and submit for approval and acceptance, an Overflow Response Plan specific to the task and in accordance with the City’s Overflow Emergency Response Plan; • Billing shall be performed monthly and in-line with the Price and Fee Bid sheet; and • Enter into a service agreement with the City for services provided above. The service agreement will be drafted and approved by the City. • Contractor must respond to on-call sewer collection system repair services within 24-hours. • Contractor must be within 30 miles from the City of Redlands Municipal Utilities & Engineering Department: 35 Cajon St. Suite 15A, Redlands CA 92373
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2025
January 17, 2026
To be determined, Redlands, CA
Related To This Project
Redlands, CA
--
Redlands, CA
--
Redlands, CA
Bid Date: Dec 04 2025
Redlands, CA
Bid Date: Dec 11 2025
Redlands, CA
Bid Date: Jan 07 2026
Redlands, CA
Bid Date: Jan 08 2026
Redlands, CA
Bid Date: Jan 22 2026
Redlands, CA
Bid Date: Jan 22 2026
Redlands, CA
Bid Date: Dec 09 2025
Redlands, CA
Bid Date: Nov 19 2025
Redlands, CA
Bid Date: Nov 05 2025
Redlands, CA
Bid Date: Nov 13 2025
Redlands, CA
Bid Date: Oct 28 2025
Redlands, CA
Bid Date: Nov 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
