BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2025 at 7:00 PM

Updated December 9, 2025

This is a service / maintenance or supply contract in Murrieta, California. Contact the soliciting agency for additional information.

Prior to the RFP submission deadline questions may arise regarding the specifications and procedural or administrative matters. By 5:00 pm on Wednesday, November 19, 2025, all questions pertaining to this RFP shall be submitted using the City of Murrieta portal. Anticipated Contract Award: January 20, 2025 Contractor Commences Full Operations February 2026 The work performed under this Agreement shall include the furnishing of all labor, materials, and equipment necessary to perform street striping and pavement markings within the City. All work shall be done in accordance with the latest edition of Caltrans Standard Plans and Specifications, the latest adopted edition of the "Greenbook" Standard Specifications for Public Works Construction, Special Provisions and Technical Specifications provided herein. II. DESCRIPTION OF WORK The types of street striping and related services shall include, but are not limited to the following: A. Installation of thermoplastic and/or painted traffic stripes and pavement markings. B. Removal of thermoplastic and/or painted traffic stripes and pavement markings. C. Re-striping of thermoplastic and/or painted traffic stripes and pavement markings per existing alignment. D. Placement and removal of raised pavement markers. E. Paint and removal of reflective color curb markings. F. Perform street sweeping and/or clean the pavement surface immediately prior to the application of all traffic stripes and pavement markings to ensure a clean, dry, and debris-free surface. G. Provide necessary traffic control measures. H. Provide necessary public notification (as approved by the City). I. Obtain a no fee City Encroachment Permit. J. Obtain a California Department of Transportation (Caltrans) Encroachment Permit when work is required within its right-of-way. Task Orders must be completed within twenty one (21) calendar days after receipt of written request by the City unless other arrangements have been made with the City in writing.

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
1
Bidding Soon
1,931
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2025

February 1, 2026

Project location map

To be determined, Murrieta, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.