BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Renovation of a mixed-use development in Andes, New York. Completed plans call for the renovation of a educational facility.

Furnish material and labor to complete the 2024-2025 Capital Project which includes reconstruction and alterations. Ventilation System Improvements include Unit Ventilator Replacement at existing classrooms and PTAC Replacement at existing offices. Hot Water Heater Replacement in the 2002 Addition. Limited Abatement in the original 1939. Roof Replacement at the 2002 Addition. The scope also includes the removal and reinstallation of existing Solar Panels and associated equipment. A full performance bond, together with labor and material payment bonds in form acceptable to the Owner shall be required of the successful Bidder for the full contract amount. The Margaretville Central School District reserves the right to waive any informalities or irregularities in the Bids received, and/or to reject all Bids without explanation. Question Deadline 11/24/2025 at 12:00 PM ET No interpretation of the meaning of the Contract Documents, the existing conditions, or of the scope of work will be made verbally. Provide every request for such interpretation in writing, addressed to CSArch, Attention: Patricia Turner, 19 Front Street, Newburgh, NY 12550-7601 or by e-mail: pturner@csarchpc.com The Work of the Project is defined by the Contract Documents and includes but is not limited 1. Margaretville Central School Building - Volume 1 of 1 a. Abatement of Hazardous Materials b. Roofing Removals and Replacement c. Unit Ventilator Replacement d. HVAC Upgrades to Office Areas e. Ceiling re-work and new install to accommodate HVAC Install f. Gymnasium Facade replacement g. Classroom Casework adjustments for New UV Install h. Library Floor Replacement i. Domestic Hot Water Heater Replacement Contract No. 01 GC - General Construction Work Contract No. 02 MC - Mechanical Construction Work Contract No. 03 EC - Electrical Construction Work Contract No. 04 PC - Plumbing Construction Work Contract No. 05 TEC - Temperature Controls Construction Work Final completion date: 30 days after Substantial Completion. 1. Work is scheduled to commence upon award of bids and no later than May 11, 2026. 2. All work will be required to be completed no later than August 21, 2026.

Sub-Bidding

Educational

$300,000.00

Public - City

Renovation

80

24

9

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
382
Active Projects
212
Bidding Soon
2,856
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

May 11, 2026

Project location map

451 Main St, Andes, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.