Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 11, 2025 at 7:00 PM

Updated December 3, 2025

Site work and paving for a mixed-use development in Junction City, Kansas. Completed plans call for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project will be comprised of the removal of the existing asphalt pavement and replacement with concrete pavement on Burke Drive at City Community College. Along with; curb and guttering, ADA sidewalk ramps, and sidewalk replacement (shown as Alt. 1). All contractors will submit bids following specifications as called out in the SMH Consultants Burke Drive Replacement Documents. All contractors will submit bids as followed; 1. As called out in SMH Consultants Burke Drive Replacement Documents at 8-inch-thick concrete pavement roadway. 2. As called out in SMH Consultants Burke Drive Replacement Documents with revision of 7-inch-thick concrete pavement roadway. 3. Separate additional cost as called out in SMH Consultant Burke Drive Replacement Documents of "ALT #1 - REPLACE 4' CONCRETE SIDEWALK 10' WIDE." Project start date called out as mid-May is negotiable if DC3 agrees with appropriate phasing. Notification of successful bidder (Pending BOT Approval) December 10th, 2025

Post-Bid

Sidewalks / Parking Lot

$600,000.00

Public - City

Paving, Site Work

7

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
52
Bidding Soon
356
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2025

January 2, 2026

Project location map

1010 Burke Dr, Junction City, KS

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed