BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Renovation of a municipal facility in Middleton, Wisconsin. Completed plans call for the renovation of a municipal facility.

Pre-Bid Meeting Info: no pre-bid meeting for this project. Project Category Code: Heating, Ventilation, Air Conditioning (HVAC). This project includes replacement of the existing Honeywell HVAC control system with a new Prolon Boiler controller and Flex controller with new sensors and controllers.

Bid Results

Municipal

$69,779.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
83
Bidding Soon
1,340
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

January 2, 2026

Project location map

2020 Parmenter St, Middleton, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.