BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2026 at 7:00 PM

Updated January 8, 2026

Site work for a water / sewer project in Troy, Missouri. Completed plans call for site work for a one-story above grade water / sewer project.

As of January 7, 2025 the project has been awarded. The project consists of installing an approved Potable Water Tank Active Mixing System capable of completely mixing the 1,000,000 gallon Highway 47 Elevated Water Storage Tank and the 500,000 gallon Cherry Street Elevated Water Storage Tank. The mixing system is to include telemetry and SCADA control. Bids will be received for a single prime contract and shall be on a lump sum price basis. Bid security shall be furnished in accordance with the instructions to bidders. Prevailing wage is not required for projects with a total cost of less than $75,000. Performance and payment bonds are not required. The Work will be substantially completed within 60 days after the date when the Contract Times commences in accordance with the Notice to Proceed, and completed and ready for final payment within 90 days after the date when the Contract Times commence to run. Performance and Payment Bonds are not required The mixing system is to include telemetry and SCADA control. The Highway 47 Tank is located along the intersection of Highway 47 and S. Moore School Road, on the west side of Troy, Missouri. The Cherry Street Tank is located on E. Cherry Street, east of Hwy 61 and Ease of Mercy Hospital. Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: The installation of a tank mixing system in the 1,000,000 gallon Hwy 47 Elevated Tank and the installation of a tank mixing system in the 500,000 gallon Cherry Street Elevated Tank. The Project, of which the Work under the Contract Documents is a part, is generally described as follows: HWY 47 TANK AND CHERRY STREET TANK MIXING SYSTEMS To provide the Contractor a clear and uniform method of payment for items of work performed. B. The Contractor shall be paid in accordance with each item listed on the Bid Form which shall be measured by the Owner or his authorized representative with the assistance of the Contractor. C. Payment to the Contractor shall be made based on percentage of the work completed in accordance with the bid items or the schedule of values. D. All work essential to the proper completion of the work of each bid item shall be considered as incidental even if not specifically detailed or described. The Contractor shall not be entitled to extra compensation for such incidental items unless otherwise stated. E. Unless otherwise stated, the Contract Price shall include payment to the Contractor for furnishing all labor, equipment, mobilization, materials, tools, and incidentals necessary to fully complete the item

Award

Water / Sewer

$56,282.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
0
Bidding Soon
981
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2025

January 1, 2026

Project location map

To be determined, Troy, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.