BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Site work for a power facility in Lehi, Utah. Completed plans call for site work for a power facility.

This Request for Proposal (RFP) will assist Lehi City in the selection of a qualified contractor for the construction of the Skye substation located This Request for Proposal (RFP) will assist Lehi City in the selection of a qualified contractor for the construction of the Skye substation located at approximately 4700 North Center Street, near the existing 138kV line crossing. Question Deadline 12/02/2025 Questions regarding this RFP should be submitted through Bonfire All questions should be received two (2) business days prior to the RFP due date. Lehi City Power (LCP) is seeking a qualified contractor to assist with the construction of the new Skye Substation, located near 4700 North Center Street in Lehi. The substation will interconnect with the nearby 138 kV PacifiCorp transmission line as part of LCP's ongoing system expansion and reliability improvements. As described above the project consists of the construction of a new 138kV-13.2kV substation to interconnect to the existing 138kV PacifiCorp transmission line. This project will require the contractor to perform the following. Work shall include: - All necessary site preparation, storm water management and debris management and containment throughout construction, grading and fill (Contractor is responsible for supplying, placing, compacting, and grading fill material), any required relocation or installation of drainage piping to tie into existing site drainage. - The contractor is responsible for installation, adjustment, placement, and testing of all Owner and Contractor provided electrical equipment, structural steel, concrete foundations, grounding equipment, above and below grade conduit (including feeder getaway conduits to distribution equipment), and finish rock for a complete and functioning facility. The substation transformer will be set and dressed by the manufacturer, and the contractor will be required to be onsite for assistance should it be required. The placement and dressing of the switchgear building shall be the responsibility of the Contractor. - The contractor is responsible for the installation of all new equipment and all additional primary, secondary, control and grounding connections to the equipment. All conduit, foundations, fiberglass grating, and grounding attachment points are included in this scope. - Contractor will provide all labor and materials as listed on the Bill of Materials drawings for the substation (as noted on the drawing), in addition to all miscellaneous equipment and materials (conduit, cables, lugs, terminations, labels, grounding equipment and conductor, foundations, structural steel, crushed rock surfacing, etc.) for a complete, functional, and working Electrical Substation. Contractor is responsible for previously described foundation work (earthwork, formwork, backfill, anchor bolts, soil compaction, reinforcement, concrete, curing, finishing, joints, and other related work) within the substation. The work includes the entirety of all conduits associated with the new substation. - Contractor is responsible for placing, dressing, aligning, and testing all equipment within scope of work (both Owner and Contractor supplied, transformer testing is outside of Contractor's scope). Contractor is responsible for all primary and electrical control wiring, grounding connections, and lightning static wire within the Substation and Substation Control Panel(s). Contractor is responsible for all testing including wiring and relay testing. - Contractor is responsible for all chain link fencing (680 feet). Fencing height needs to be as per the National Electric Safety Code

Sub-Bidding

Power Plant

$8,000,000.00

Public - City

Site Work

43

12

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
83
Bidding Soon
1,001
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.