Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 18, 2025 at 7:00 PM
Updated November 19, 2025
Renovation of a mixed-use development in Dahlgren, Virginia. Conceptual plans call for the renovation of a military facility; and laboratory facility.
The contractor shall provide all management, labor, materials, equipment, transportation, supervision, and environmental and quality controls necessary to perform simultaneous maintenance, sustainment, repair, and minor construction projects. These services will be executed at multiple locations including Naval Surface Warfare Center Dahlgren Division (NSWCDD), Pumpkin Neck Annex in King George, VA, Surface Warfare facilities at Wallops Island, VA, and NSWCDD facilities at the Naval Observatory in Washington, DC. The scope includes joint scoping of project requirements, field surveys, soil and hazardous material sampling, engineering evaluations, and energy performance computations. All work must comply with Navy and local regulations, building codes, and life safety requirements. Contractors must coordinate with NSWCDD and NAVFAC, maintain project schedules, obtain necessary permits, and provide training and documentation for critical systems. Personnel must be qualified, certified, and trained in HAZCOM and privacy regulations. The contractor must comply with safety and environmental standards, manage hazardous materials, and ensure secure handling of sensitive information. Portable electronic devices are restricted, and operations security (OPSEC) and privacy training are mandatory. The contractor is responsible for managing its personnel and ensuring non-personal services are provided. Key personnel substitutions require prior approval, and all work must be documented and reported per Contract Data Requirements List (CDRL) items. Location: Naval Surface Warfare Center Dahlgren Division (NSWCDD), Dahlgren, VA Pumpkin Neck Annex Explosive Experimental location, King George, VA Surface Warfare facilities, Wallops Island, Eastern Shore, VA NSWCDD facilities, Naval Observatory, Washington, DC The resultant MACC will consist of either a five year ordering period, or a base-year plus four (4) option periods (12 months each). The total magnitude of all construction projects covered by the MACC is estimated between $25,000,000 and $50,000,000. Questions and comments are to be submitted to Darrell.s.haas.civ@us.navy.mil and Sheila.h.Ballard.civ@us.navy.mil prior to this sources sought notice closing date of 2 December 2025 at 1700 EST. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Military
$50,000,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 2, 2026
Multiple Locations, Dahlgren, VA
Related To This Project
Dahlgren, VA
Bid Date: Oct 24 2025
Dahlgren, VA
Bid Date: Dec 04 2025
Dahlgren, VA
Bid Date: Nov 06 2025
Dahlgren, VA
--
Dahlgren, VA
Bid Date: Jun 17 2025
Dahlgren, VA
Bid Date: Apr 23 2025
Dahlgren, VA
Bid Date: Aug 19 2024
Dahlgren, VA
Bid Date: Sep 19 2024
Dahlgren, VA
Bid Date: Jul 31 2024
Dahlgren, VA
Bid Date: Jul 02 2024
Dahlgren, VA
Bid Date: May 17 2024
Dahlgren, VA
Bid Date: Jun 26 2024
Dahlgren, VA
--
Dahlgren, VA
Bid Date: Mar 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
