Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 9, 2026 at 7:00 PM
Updated February 10, 2026
Site work and new construction of a civil project in Robinson, Illinois. Completed plans call for the construction of a one-story above grade water / sewer project; and one-story above grade water / sewer project.
Division A includes a new 1,800 gallon per minute filtration and Per- and Polyfluoroalkyl (PFAS) removal water treatment plant with related site improvements and accessories; associated pumps, piping, valves, structures, electrical work and appurtenances. Electrical work includes outside conduits, feeders, and light poles. The work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents. Buildings include the office building with maintenance shop area, cold storage, and water treatment plant. Division A includes all work not defined in Division B and C. Site location- 10711 IL-1 Robinson, IL 62454 Division B includes two (2) one million gallon ground storage tanks. Work includes site grading, earthwork, foundation, steel erection, and coating. Foundation/concrete work to include valve vault, valve(s), and piping extend outside of the vault or foundation shall be included. Electrical conduits, conductors, and pressure sensors are not included in the contract. Division C includes all underground water main, water services, sanitary sewer, and storm sewer within 5' of the building/structure or foundation. In addition to the water main, all manhole structures (excluding the head tank) shall be included. Fire hydrants to flush the head tank shall be included in Division C work. This work includes the conversion of the raw water main to finish water main, requiring multiple mobilizations to connect, disconnect, tap, and plug the water mains. A certified check or bank draft payable to the order of Robinson Palestine Water Commission, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Base Bid for the Divisions bid shall be submitted with each Bid. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bids will be held good for a period of ninety (90) days subsequent to the opening of Bids. Question Deadline 01/28/2026 Questions received less than seven days prior to the date for opening of Bids may not be answered. A. Farnsworth Group, Inc, Andrew Hanfland, PE, Email: ahanfland@f-w.com (preferred). B. Farnsworth Group, Inc., Email: ssanju@f-w.com 2.5 % for MBEs and 6.9 % for WBEs . Custom bid result DIVISION A Grunloh Building, Inc.- $24,069,283 DIVISION B Grunloh Building, Inc.- $2,796,094 DIVISION C Kieffer Bros Const. Co., Inc.- $1,067,118
Bid Results
Water / Sewer
$24,069,283.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
