BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2026 at 7:00 PM

Updated January 9, 2026

Site work and renovation of a water / sewer project in Rosenberg, Texas. Completed plans call for site work for a water / sewer project; and water / sewer project.

For Aeration Basin Assessment and Rehabilitation Project. Should you have any questions or require additional information or clarification on information contained in the RFP, please submit your questions via electronic Procurement at the website listed above Question Submission Deadline December 5, 2025, 5:00pm The City of Rosenberg is seeking sealed proposals from qualified vendors for the above-mentioned project. The purpose of this project is to clean and remove accumulated liquid sludge, grit, and sediment from one of the two Aeration basins at Wastewater Treatment Plant 2 located at 3650 North Fairgrounds Road, Rosenberg, TX 77471. The work will include removal of remaining grit/sediment, and proper disposal in accordance with federal, state, and local regulations. The Aeration basin must be fully cleaned and inspected to ensure it is ready for the next phase of repair. 4.1. Preparation and Coordination o Coordinate with City/Plant staff for project scheduling and Aeration basin shutdown. o Implement necessary safety and confined space entry procedures. o Provide all equipment (pumps, hoses, tankers, etc.) for sludge transfer. 4.2. Sludge Transfer o After liquid removal, remove all residual grit, sand, and sludge from the bottom of the Aeration basin. o Perform manual or mechanical cleaning (Vacuum Truck, hydro-excavation, etc.) to remove all solids and debris. o Inspect and report any visible damage to the aeration piping system or other visible equipment. 4.3. Disposal o Transport and dispose of all removed solids, grit, and sludge at an approved disposal facility. o Provide disposal manifests, weight tickets, and any additional documentation to the Owner. 4.4. Site Restoration and Demobilization o Clean all work areas and remove all equipment and temporary materials. o Restore the site to original condition. o Conduct a final inspection with the Owners representative. 4.5. Safety and Compliance o Contractor shall comply with all OSHA and TCEQ safety and environmental regulations. o Confined space entry must follow 29 CFR 1910.146 standards. o Contractor must have appropriate insurance and licensing for sludge transport and disposal. 4.6. Deliverables o Work plan and schedule for Owner approval prior to mobilization. o Copies of disposal manifest and weight tickets. o Before and after photos of the Aeration basin. o Final report summarizing work performed and Aeration basin condition.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Renovation, Site Work

1

9

135

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
246
Bidding Soon
3,221
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

January 12, 2026

Project location map

3650 Fairgrounds Rd, Rosenberg, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.