Published January 15, 2026 at 7:00 PM

Updated January 16, 2026

Site work for a water / sewer project in Orangeburg, South Carolina. Completed plans call for site work for a one-story above grade water / sewer project.

Prep, clean, containment, blast interior and exterior, paint/finish the interior and exterior surfaces of the tank (including concrete base), painting exposed piping, and miscellaneous repairs/tasks at the Whaley Street Tank (250,000 gallons) and St. Matthews Tank (250,000 gallons) as indicated or specified and as needed for a complete and proper installation. A. Work included: This section establishes requirements pertaining to the securement and payment for licenses, building permits, rights-of-way, etc., necessary for the construction of the project. B. Related work: Documents affecting work of this section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these specifications. A. Throughout the Project Documents, reference is made to specifications and standards issued by nationally recognized professional and/or trade organizations. 1. These referenced standards are generally identified by abbreviating the name of the organization following with the specification/standard number. 2. Unless specifically indicated otherwise, all references to standards refer to the latest edition available at the time of the bidding A. Work included: To help clarify construction contract administration procedures, the Engineer will conduct a Preconstruction Conference prior to start of the Work. Provide attendance by the designated personnel. B. Related work: Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications. A. Work included: To enable orderly review during progress of the Project, and to provide for systematic discussion of problems, the Engineer will conduct project meetings throughout the construction period. B. Related work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications. 2. The Contractor's relations with his subcontractors and materials suppliers, and discussions relative thereto, are the Contractor's responsibility and normally are not part of project meetings content. A. Work included: To assure adequate planning and execution of the Work so that the Work is completed within the number of calendar days allowed in the Contract, and to assist the Engineer in appraising the reasonableness of the proposed schedule and in evaluating progress of the Work, prepare and maintain the schedules and reports described in this Section. B. Related work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications. 2. Requirements for progress schedule: General Conditions. 3. Construction period: Form of Agreement. C. Definitions: "Day", as used throughout the Contract unless otherwise stated, means calendar day. A. Work included: Make submittals required by the Contract Documents and revise and resubmit as necessary to establish compliance with the specified requirements. B. Related work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these specifications. 2. Individual requirements for submittals also may be described in pertinent sections of these specifications. C. Work not included: 1. Unrequired submittals will not be reviewed by the Engineer. 2. The Contractor may require his subcontractors to provide drawings, setting diagrams, and similar information to help coordinate the work, but such data shall remain between the Contractor and his subcontractors and will not be reviewed by the Engineer. A. Work included: Provide temporary facilities needed for the work including, but not necessarily limited to: 1. Temporary utilities such as heat, water, electricity, and telephone. 2. Sanitary facilities. B. Related work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these specifications. 2. Permanent installation and hookup of the various utility lines are described in other Sections. A. Work included: Protect products scheduled for use in the work by means including, but not necessarily limited to, those described in this Section. B. Related work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these specifications. 2. Additional procedures also may be prescribed in other Sections of these specifications. A. Work included shall be providing compliance with the requirements of the General Conditions of these Specifications for administrative procedures in closing out the project work. B. Related work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications. 2. Other requirements for technical services are stated in other sections of these Specifications. 3. Section 00690 - Contractor's Affidavit. A. Work included: Trench, backfill, and compact as specified herein and as needed for installation of underground utilities associated with the Work. B. Related work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions and Sections in Division 1 of these Specifications. 2. Section 02760 - Tank Piping, Valves, and Appurtenances.

Post-Bid

Water / Sewer

$5,000,000.00

Public - City

Site Work

26

2

8

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
1
Bidding Soon
541
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

February 3, 2026

Project location map

To be determined, Orangeburg, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.