BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2026 at 7:00 PM

Updated January 22, 2026

Renovation of a detention facility in McKinney, Texas. Completed plans call for the renovation of a detention facility.

As of January 21, 2026, this project has not yet been awarded. The project is expected to be awarded within the next 90 days. Question and Substitution Request Submission Deadline: December 9, 2025, 5:00pm SCOPE OF WORK INCLUDES all materials, labor, equipment and services to produce or be incorporated in such construction. Contract will be a general contract to purchase and install a new diesel generator and associated work at the Collin County Adult Detention Facility (CCADF), Cluster 1 as described within the project documents. The project includes disconnecting and removing the existing generator and installing and connecting the new generator. Final testing on all equipment for verification of operation at full load is required. BID SECURITY: All Bidders must submit, prior to the bid opening time, a Certified Check, Cashier's Check or acceptable Bid Bond payable without recourse to Collin County in the amount of not less than five percent (5%) of the total bid plus alternates as submitted. Contractor must furnish a performance bond, payment bond and two (2) year maintenance bonds within ten (10) consecutive calendar days following award of contract.

Bid Results

Jails / Prisons

$241,770.00

Public - County

Renovation

7

11

4

9

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

January 19, 2026

Project location map

4600 Community Ave, McKinney, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.