Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 4, 2025 at 7:00 PM
Updated December 6, 2025
Site work and paving for a bridge / tunnel in Winnipeg, Manitoba. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Reference Number 0000307649 The Work to be done under the Contract shall consist of structural pier rehabilitation works underwater riprap placement and installation of bridge bearings. Parts of Work include: (a) Part 1 - must be completed by June 30, 2026 and shall include structural pier rehabilitation and riprap placement at Pier SU2 as well as bridge bearing replacement at the South Abutment. SU1. (b) Part 2 - may be undertaken in the same timeframe as Part 1 or may be deferred to fall/winter of 2026/2027 and be completed by June 30, 2027. The exact schedule is subject to the Contractor's binding declaration as per D21. It shall consist of structural pier rehabilitation and riprap placement at SU4 and bridge bearing replacement at SU5. The major components of the Work for both Part 1 and Part 2 are as follows: (a) Mobilization (b) Traffic Control (c) Installation and removal of temporary access berms in the Red River. (d) Supply and installation of sheet piling around perimeter of river piers. (e) Partial removal of existing concrete collars on limestone block river piers. (f) Design, supply, and installation of micro-piles around perimeter of river piers. (g) Installation of reinforcement ties including coring transversely through concrete-rubble-filled limestone block pier shafts, casing the core holes and grouting the bars. (h) Supply and installation of reinforcing steel dowels into the limestone block piers. (i) Supply and placement of concrete reinforcing steel. (j) Supply and installation of reinforced concrete base slabs and pier jackets at river piers. (k) Supply and placement of underwater riprap. (l) Temporary jacking and support of bridge superstructure. (m) Removal of existing bridge bearings. (n) Installation of new bridge bearings supplied by others. (o) Fabrication of miscellaneous metal. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Post-Bid
Bridges / Tunnels
$400,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2025
January 5, 2026
Multiple Locations, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Dec 15 2025
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Dec 16 2025
Winnipeg, MB
Bid Date: Nov 21 2025
Winnipeg, MB
Bid Date: Dec 12 2025
Winnipeg, MB
Bid Date: Dec 09 2025
Winnipeg, MB
Bid Date: Dec 11 2025
Winnipeg, MB
Bid Date: Dec 16 2025
Winnipeg, MB
Bid Date: Dec 17 2025
Winnipeg, MB
Bid Date: Nov 18 2025
Winnipeg, MB
Bid Date: Dec 09 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
