Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 6, 2026 at 7:00 PM
Updated January 7, 2026
Renovation of an elderly care / assisted living facility in Calgary, Alberta. Completed plans call for the renovation of a elderly care / assisted living facility.
The scope of work for the Alex Walker Tower - Five Suite Renewal Project encompasses the complete interior refurbishment of units 209, 304, 305, 1401, and 1406. Work includes the full demolition and replacement of kitchens, bathrooms, flooring, doors, lighting, finishes, and associated mechanical and electrical components, ensuring all installations comply with current codes and Silvera for Seniors' quality standards. As these facilities are occupied, the contractor must coordinate closely with Silvera to minimize disruption, maintain safe working conditions, adhere to strict asbestos-abatement protocols where applicable, and manage all waste independently of Silvera's disposal systems. Each suite renovation involves converting existing tub assemblies to acrylic shower systems with new tile surrounds, grab bars, valves, fixtures, exhaust fans, vanities, countertops, accessories, and comfort-height toilets. Kitchens require removing all millwork and installing custom cabinetry, quartz countertops, double sinks, faucets, under-cabinet lighting, new range hoods, and a tile backsplash. The scope also includes full-suite flooring replacement with coved resilient sheet goods, bathroom-rated flooring, drywall repair, and repainting of all surfaces with specified coatings. Additional tasks include replacing light fixtures throughout, upgrading electrical devices and GFI protection, repairing or replacing heating cabinet covers and zone valves, installing new window shades, and ensuring all plumbing fixtures and windows operate properly. Upon completion, each suite must be professionally cleaned and delivered ready for occupancy. The contractor is responsible for obtaining all required permits, submitting a construction schedule, maintaining daily sign-in/out procedures, and protecting existing building systems. Any damage to building property must be repaired at the contractor's expense. All work must be completed within 8-10 weeks, in accordance with Silvera's safety protocols, quality expectations, and documentation requirements. Question Deadline 12/03/2025 at 3:00 PM MT Questions must be submitted by email jrodriguez@silvera.ca. Answers will be issued as addenda through electronically.
Bid Results
Elderly Care / Assisted Living
$125,480.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
January 5, 2026
124 15 Ave SW, Calgary, AB
Related To This Project
Calgary, AB
--
Calgary, AB
Bid Date: Dec 18 2025
Calgary, AB
Bid Date: Dec 11 2025
Calgary, AB
Bid Date: Jan 13 2026
Calgary, AB
--
Calgary, AB
--
Calgary, AB
--
Calgary, AB
Bid Date: Dec 11 2025
Calgary, AB
--
Calgary, AB
Bid Date: Dec 16 2025
Calgary, AB
Bid Date: Dec 19 2025
Calgary, AB
Bid Date: Dec 16 2025
Calgary, AB
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
