BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2025 at 7:00 PM

Updated December 2, 2025

Site work, remodeling and addition to an educational facility in Canton, Michigan. Completed plans call for the addition of a one-story above grade educational facility; and one-story above grade educational facility.

Sealed Bids are requested for Plymouth-Canton Community Schools, 2020 Bond, PCCS EL-4, which consists of Gallimore Elementary Addition & Remodeling and Hoben Elementary Remodeling. Bids must be electronically submitted by the specified Due Date through Building Connected. Bids submitted after the Due Date, or by fax/email, will not be accepted or considered. The bid package consists of separate sealed Bids for specific Bid Divisions including Earthwork/Site Utilities, Asphalt Paving & Exterior Concrete, Selective Demolition, Concrete Footings & Foundations, Interior Concrete Flat Work, Masonry, Steel, Carpentry/General Trades, Roofing/Sheetmetal, Aluminum Entrances/Storefront/Glass & Glazing, Metal Stud/Drywall, Hard Tile, Acoustical Treatments, Carpet/Resilient Tile Flooring, Painting, Toilet Partitions, Prefabricated Case Work, Window Treatments, Plumbing, HVAC, Electrical, and Fencing. Instructions to bidders: Bids must be submitted electronically through Building Connected; late, faxed or emailed Bids will not be accepted. For submission instructions, refer to the provided Building Connected guide. All Bids must include sworn and notarized statements: Familial Disclosure Affidavit, Iran Linked Business Affidavit, and Criminal Background Check Affidavit. A bid security of 5% of the Bid amount (bid bond, cashier check, or certified check) is required with each Bid. Cashier’s checks must also be delivered to the designated address within 48 hours of the Due Date. If awarded, the Bidder will execute the Contract, provide required insurance and bonds within ten days of award notice and before work commences. Performance and labor/material payment bonds may be required at 100% of the Contract price. The School District reserves the right to accept or reject any and all Bids or waive any informalities or irregularities in bids.

Post-Bid

Educational

$4,000,000.00

Public - City

Addition, Remodeling, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
334
Active Projects
161
Bidding Soon
2,543
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

January 15, 2026

Project location map

44680 Saltz Rd 8375 Sheldon Rd, Canton, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.