BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2025 at 7:00 PM

Updated November 23, 2025

Site work for a civil project in Avon, Massachusetts. Conceptual plans call for site work for a water / sewer project.

Time Period for Completed Project Summer 2027 Avon Industrial Park - Sewer Engineering Design for approximately 25,000 feet of gravity sewer, to include a pump station and force main connection to the Town of Stoughton. Develop bid ready package for a municipal sewer collection system in the Avon Industrial Park. Full Engineering and Design, to include all permitting through the MWRA, WRC, and Town of Stoughton, MA. Outreach, Grant Support, and Betterment methodologies Specified Services(all chosen) Engineer Land Surveyor Project Manager Contact Jonathan Beder, Town Administrator at 508-588-0414 x1020 with questions. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$45,000,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
550
Active Projects
309
Bidding Soon
3,944
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.