Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 25, 2025 at 7:00 PM
Updated December 26, 2025
Site work for a water / sewer project in Smithfield, North Carolina. Completed plans call for site work for a one-story above grade water / sewer project.
EPA MBE/WBE participation goals: MBE 10.9% WBE 10.4% To ensure a fair bidding process, all other questions from the contractors must be emailed to Robert Bernard robert.bernard@stantec.com no later than 3:00 P.M., on October 23 2025. These questions will be addressed in an Addendum. Work on this project shall be covered by a Single Prime Contract. Demolition of the existing Town pump station and construction of a new 3.0 MGD pump station, including wet well, pumps, control systems, electrical, generator, and associated apparatus & systems. Construction of approximately 9,500 LF and 20-inch diameter DIP force main, including piping, valves, blow-offs and the connection of the outlet force main to the Johnston County Waste Water Treatment Plant. The work includes providing all labor, equipment, and materials for utility construction services. The project generally comprises utility installation, repairs, replacements, relocations, and maintenance of water, sanitary sewer, and storm sewer systems. Work may also involve construction and/or rehabilitation of manholes, appurtenances, and various related structures. Bidders are instructed to examine the site, make required investigations, and carefully review the requirements before submitting a bid. Bidders must submit their proposals as specified and ensure all required documentation is included. Work on this project shall be covered by a single or multiple Prime Contract(s). The extent of this work includes furnishing of all materials and labor necessary for the complete construction of the Pump Station #1 Improvements, as shown on the plans and as outlined in these specifications. Demolition of the existing Town pump station and construction of a new 3.0 MGD pump station, including wet well, pumps, control systems, electrical, generator, and associated apparatus & systems. To ensure a fair bidding process, all other questions from the contractors must be emailed to Robert Bernard robert.bernard@stantec.com no later than 3:00 P.M., on Tuesday December 16, 2025. These questions will be addressed in an Addendum. EPA MBE/WBE participation goals: MBE 10.9% WBE 10.4% State of NC MBE/WBE participation goal: 10% (combined)
Bid Results
Water / Sewer
$1,029,063.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 23, 2025
January 22, 2026
240 W Market St, Smithfield, NC
Related To This Project
Smithfield, NC
Bid Date: Dec 23 2025
Smithfield, NC
Bid Date: Dec 10 2025
Smithfield, NC
Bid Date: Jan 07 2026
Smithfield, NC
Bid Date: Jan 12 2026
Smithfield, NC
Bid Date: Jan 21 2026
Smithfield, NC
Bid Date: Jan 05 2026
Smithfield, NC
Bid Date: Oct 30 2025
Smithfield, NC
Bid Date: Oct 17 2025
Smithfield, NC
Bid Date: Jul 09 2021
Smithfield, NC
Bid Date: Sep 22 2025
Smithfield, NC
Bid Date: Oct 23 2025
Smithfield, NC
--
Smithfield, NC
--
Smithfield, NC
Bid Date: Aug 26 2025
Smithfield, NC
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
