Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 7, 2026 at 7:00 PM
Updated January 8, 2026
Site work and paving for a mixed-use development in Marysville, Washington. Completed plans call for site work for a one-story above grade sidewalk / parking lot; and one-story above grade road / highway.
**As of January 7, 2026 , this project has not yet been awarded. The project is expected to be awarded on January 12, 2026.** The work to be performed includes the construction of sidewalk and roadway widening from Smokey Point Boulevard to Hayho Creek. It involves grading, installation of a vegetated faced geosynthetic wall, and storm drainage facilities. The project includes intersection improvements at 39th Avenue NE such as curb ramps, curb and gutter, pavement restoration, hardscape/landscape features, and pavement marking. A new pedestrian traffic signal is to be installed at 156th Street NE and Smokey Point Boulevard, along with a new illumination system along the corridor, and the installation of landscape and irrigation improvements, plus any other work necessary to complete the project. All work must comply with applicable federal, state, and local laws and regulations, and be completed in accordance with the contract documents. Each bid must be accompanied by a certified check, cashier's check, or bid bond in an amount not less than five percent (5%) of the bid amount. The City reserves the right to reject any and all bids and waive any irregularities or informalities. No bidder may withdraw its bid after the opening or before contract award, unless said award is delayed for a period of forty-five (45) days. The City further reserves the right to make the bid award as deemed in its best interest. Disadvantaged business enterprises will be afforded full and fair opportunity to submit bids and will not be discriminated against based on race, color, or national origin in consideration for an award. Plans, specifications, addenda, and the plan holders list are available online through Builders Exchange of Washington, Inc., and may also be obtained directly through the City by contacting the Project Manager. The Engineer's Estimate for this project is $2,250,000 to $2,550,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Roads / Highways
$1,743,397.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 15, 2025
February 16, 2026
156th Street NE Smokey Point Boulevard to Hayho Creek, Marysville, WA
Related To This Project
Marysville, WA
Bid Date: Dec 31 2025
Marysville, WA
Bid Date: Dec 12 2025
Marysville, WA
Bid Date: Dec 02 2025
Marysville, WA
--
Marysville, WA
--
Marysville, WA
--
Marysville, WA
--
Marysville, WA
Bid Date: Sep 25 2025
Marysville, WA
Bid Date: Sep 18 2025
Marysville, WA
--
Marysville, WA
--
Marysville, WA
Bid Date: Aug 13 2025
Marysville, WA
Bid Date: Jul 23 2025
Marysville, WA
Bid Date: Jul 02 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
