Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 16, 2026 at 7:00 PM

Updated February 17, 2026

Site work for a bridge / tunnel in Marysville, Washington. Conceptual plans call for site work for a one-story above grade bridge / tunnel.

**As of February 16, 2026, the selected designer is Otak Inc. A timeline for the award has not yet been established.** The City of Marysville is seeking proposals from qualified engineering firms to provide professional services for the 51st and 132nd Culvert(s) Replacement Project, which aims to achieve measurable and lasting benefits to native migratory or sea-run fish populations through fish passage barrier removal. For questions, please contact: Steven Miller at 360.363.8285 or via e-mail at smiller@marysvillewa.gov.

Conceptual

Bridges / Tunnels

$200,000.00

Public - City

Site Work

3

5

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
137
Bidding Soon
2,406
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2025

February 17, 2026

Project location map

51st Ave NE and 132nd St NE, Marysville, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed