BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Cole Camp, Missouri. Completed plans call for the demolition of a one-story above grade bridge / tunnel.

The proposed work includes the removal of the existing bridge and replacement with a 55-foot precast concrete slab beam bridge. Additional work consists of minor roadway work, installation of guardrail, riprap, permanent erosion control, and other incidental work as specified in the plans and specifications. Bidders must submit hard copy bids and purchase digital plans and specifications through Great River Engineering to be listed as planholders. All contractors must adhere to prevailing wage rates as established by both the Missouri Department of Labor and Industrial Relations and the United States Department of Labor, applying the higher of the two rates. Bidders must also be on MoDOTs Qualified Contractor List and have a contractor questionnaire on file seven days before bid opening. A 10-Hour OSHA construction safety program, or department-approved equivalent, must be completed by on-site employees of contractors and subcontractors within sixty days of the project start. Each proposal must be accompanied by a certified cashiers check or bid bond in the amount of 5% of the bid. The project will be awarded to the lowest, responsive, responsible bidder. No 2nd tier subcontracting is permitted. Question Deadline 12/04/2025 Submit completed Contractor Questionnaire and/or Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening.

GC Bidding

Bridges / Tunnels

$400,000.00

Public - City

Demolition, New Construction, Paving, Site Work

26

8

2

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
74
Bidding Soon
834
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

January 12, 2026

Project location map

South Spring Street Bridge 14800071 over Otten Branch Creek, Cole Camp, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.