BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 10, 2025

Renovation of a mixed-use development in Quebec, Quebec. Completed plans call for the renovation of a educational facility.

Reference number: 20106999 Deadline for receipt of complaints 2025-12-01 Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 12 Value of the Tender guarantee (amount or percentage) : 10% Description The Centre de services scolaire des Premieres-Seigneuries wishes to retain the services of a construction contractor for temporary building work at Ecole Joseph-Paquin located at 465, 64e Rue Est, Quebec (Quebec) G1CH 1Y1. Delivery schedule WORK PERIODS Confirmation of the construction team: January 16, 2026 Plans for construction: March 27, 2026 Start of construction: April 6, 2026 Internal delivery, to take over classes: August 19, 2026. Installation of furniture before the arrival of staff Outdoor delivery: September 11, 2026, including the land April 6, 2026 to September 11, 2026 (construction site) Clarification on the work schedule 1. Current school period (25-26) - April 6, 2026 to June 26, 2026 1.1. Plan for the presence of students on site (land and building) from 7:00 AM to 6:00 PM. 1.2. Daytime work in the existing building will not be permitted unless approved by CSSPS considering the specialized clientele of the school. 1.3. School interior works 1.3.1. Dismantling work in the interior spaces of the existing school will not be permitted during the academic period unless approved by CSSPS. The exterior work can start before the end of the school year 2025-2026. Plan the presence of students on site (land and building) from 7:00 AM to 6:00 PM 1.4.1. The schedule of outdoor work must comply with municipal regulations The work can be carried out during the day, evening, and weekend according to the following schedule: 7:00 AM to 5:00 PM 1.4.2. This work must be coordinated with the owner by referring to the site organization plan. 1.5. Other milestones and/or conditions 1.5.1. The shutdown of systems in the school must be coordinated with the owner. 1.5.2. Work in the school will begin after 6 PM and must be completed by 5 AM the next morning. This work must be coordinated with the owner. 1.5.3. The weekend work in the school will be done in coordination with the client and will start after 6 PM on Friday and must be completed by 5 AM on Monday morning. 1.5.4. The contractor must ensure the cleanliness of the corridors and classrooms before the arrival of the students. 1.5.5. During this period, the ceilings may remain open conditionally. However, the contractor must not leave anything hanging from the ceilings. 2. School leave period (June 29, 2026 to August 21, 2026) - (summer holidays) 2.1. Daytime work will be allowed in the school. 2.2. Note that the administrative offices will be occupied during this period. The work in these offices must be coordinated with the school management and the CSSPS project manager. 2.3. The return from vacation for this administrative sector is on August 3, 2026 3. Construction holidays (July 18, 2026 to August 2, 2026) 3.1. Due to the importance of the project, contractors should consider continuing work during the construction holiday. If this requirement is not met, they will be required to incur the additional costs necessary to expedite work in order to maintain the schedule. 4. School period (25-26) - August 24, 2026 to September 11, 2026 4.1. Plan for the presence of students on site (land and building) from 7:00 AM to 6:00 PM. 4.2. The work in the interior premises of the temporary buildings as well as in the existing school must be completed by August 15, 2026 in order to make the start of the school year 4.3. The grand cleaning of the classrooms and waxing of the floors must be completed on August 19, 2026, in order to allow CSS to install furniture and arrange the classrooms. 4.4. The alarm and fire equipment as well as intrusion must be operational by August 19, 2026. 4.5. Work in the mechanical rooms will be able to take place during the day without restriction 4.6. The field finishing and paving work of the schoolyard must be completed no later than September 25, 2026. 4.7. The finishing work on the exterior coating must be completed by September 11, 2026, at the latest. 4.8. The weekend work in the school will be done in coordination with the owner and will start after 6pm on Friday and must be completed and before 5am on Monday morning. 4.9. The contractor must ensure that the corridors and classrooms are clean before the students arrive. 4.10. The heating equipment must be functional by September 11, 2026. The energy management system will need to be functional as well. 4.11. Week of August 10, 2026, provisional acceptance of the interior works 4.12. From August 17, 2026 to August 21, 2026 corrections of domestic deficiencies 4.13. From August 21, 2026 to September 11, 2026 corrections of deficiencies for exterior works (coating, land, paving, turf). 4.14. On September 11, 2026, final acceptance of the project and submission of end-of-work documents. (TQC, maintenance manuals, letters of guarantee, ETC.)

GC Bidding

Educational

$3,000,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
42
Bidding Soon
810
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

April 6, 2026

Project location map

465 64e Rue E, Quebec, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.