Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 22, 2025 at 7:00 PM
Updated November 23, 2025
Site work and paving for a bridge / tunnel in Gore, Oklahoma. Conceptual plans call for site work for a one-story above grade bridge / tunnel.
The Miami Tribe of Oklahoma is requesting qualifications from Architecture/Engineer (AE) firms for a bridge replacement project under the Federal Highway Administration, Department of Transportation, Tribal Transportation Facility Bridge Program (TTFBP). The selected AE will be responsible for: performing programming and necessary project studies for the site, coordinating with involved parties (notably as the site is on the Kansas/Oklahoma state line), providing a fully designed construction package (to include plans, site/project-specific technical specifications, and construction estimates) to TTFBP requirements, supplying a line-item construction estimate for the approved design package, and offering professional oversight and presence during construction in coordination with the United States Army Corps of Engineers (USACE) throughout the construction process. New and replacement structures must meet geometric, construction, and structural standards for the projected traffic volumes and design life, consistent with federal requirements. A one-year warranty after completion is required, including a walkthrough with the contractor, USACE, and Owner 12 months post-completion. The project design estimate is $100,000-$200,000. Email submissions are required by the specified deadline, including all evaluation criteria items in order. Six hard copies are also required. AE team selection is based on qualifications and experience in bridge design using Federal Highway Administration guidelines, proposed completion schedule and milestones, experience with bridge and civil design across state lines, verifiable Indian Preference, proof of business insurance and bonding capacity, and SAM.gov registration without exclusions. Additional requirements include payment and performance bonds at contracting, a certificate of liability insurance naming the Miami Tribe of Oklahoma, and no official pre-submission visit or additional questions accepted.
Conceptual
Bridges / Tunnels
$200,000.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 15, 2026
To be determined, Gore, OK
Related To This Project
Gore, OK
Bid Date: Mar 04 2026
Gore, OK
Bid Date: Feb 17 2026
Gore, OK
Bid Date: Mar 05 2026
Gore, OK
--
Gore, OK
--
Gore, OK
Bid Date: Jun 09 2025
Gore, OK
Bid Date: Jun 16 2025
Gore, OK
Bid Date: May 28 2025
Gore, OK
Bid Date: Apr 07 2025
Gore, OK
Bid Date: Mar 26 2025
Gore, OK
Bid Date: Jan 03 2025
Gore, OK
Bid Date: Jan 06 2025
Gore, OK
Bid Date: Nov 25 2024
Gore, OK
Bid Date: Jan 31 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
