Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 6, 2026 at 7:00 PM
Updated January 7, 2026
Renovation of an educational facility in McLean, Virginia. Completed plans call for the renovation of a one-story above grade educational facility.
Furnish all labor and materials for the Automatic Temperature Control (ATC) System Replacement at Chesterbrook Elementary School, in accordance with specifications and drawings available for download from the Bonfire website. A mandatory pre-bid meeting will be held at Chesterbrook Elementary School. Bidders who do not attend the pre-bid meeting will not be permitted to submit a Bid and will not be eligible for award. Onsite work shall begin upon receipt of Notice to Proceed Letter. Substantial Completion on or before August 7, 2026. Final Completion on or before August 14, 2026. Question Deadline 12/12/2025 Any question or request for an interpretation must be in writing and submitted to the Owner by email, U.S. Mail, commercially recognized overnight delivery service, or hand delivery during business hours addressed as follows: Amanda Hutchison, Senior Buyer, VCA Fairfax County Public Schools Department of Facilities and Capital Programs Office of Facilities Management 5025 Sideburn Road, Room 62 Fairfax, Virginia 22032 Telephone Number: (703) 764-2410 Email: alhutchison@fcps.edu SCOPE OF WORK: The system to be controlled under the work of this section is basically comprised of the building HVAC system. The HVAC systems being controlled are Boilers, Chillers, Associated Pumps, Fan Coil Units, Unit Ventilators, Rooftop Units, and Exhaust Fans. These specifications define the manner and methods by which these controls function. 2. GENERAL: A. Weekly Project Schedules: The Contractor shall provide weekly project schedule generated using appropriate project management software to FCPS project manager. B. Working Around Summer Programs: The possibility of summer programs and in turn working evening shift even during the summer break should be taken into consideration by Contractor. C. Project Points of Contact: Only project related FCPS personnel (Infrastructure and Environmental Engineering (IEE) Section Coordinator, Manager, Project Manager, Energy Systems Engineer, and Field Construction Representative) are points of contact for the projects. Taking directions or recommendations from non-project related personnel may result in the Contractor's liability for redoing their work to adhere to FCPS specifications at Contractor's expense. D. Measurements and Verifications: The Contractor is responsible to perform all the necessary measurements and verifications to ensure that all the submitted material will fit the application and perform per applicable FCPS sequences of operation. E. Approval of Deviations from FCPS Specifications: All the deviations from requirements per project documents including those presumably based on verbal agreement between FCPS and Contractor shall be requested for approval in writing to the FCPS project manager, IEE Section Manager or Coordinator. Failure to receive written approval for any changes from FCPS project manager or IEE Section Manager or Coordinator will result in Contractor's liability for redoing their work to adhere to FCPS specifications at Contractor's expense.
Award
Educational
$853,690.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2025
January 26, 2026
1753 Kirby Rd, McLean, VA
Related To This Project
McLean, VA
Bid Date: Jan 05 2026
McLean, VA
Bid Date: Jan 15 2026
McLean, VA
--
McLean, VA
--
McLean, VA
--
McLean, VA
Bid Date: Oct 01 2025
McLean, VA
Bid Date: Sep 19 2025
McLean, VA
Bid Date: Sep 10 2025
McLean, VA
Bid Date: Sep 04 2025
McLean, VA
Bid Date: Sep 12 2025
McLean, VA
--
McLean, VA
--
McLean, VA
Bid Date: Jul 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
