Site work for a power facility in Mansfield, Pennsylvania. Completed plans call for site work for a one-story above grade power facility.

**As of January 30th, 2026, this project has not yet been awarded. The project is expected to be awarded by the end of March** General Construction, HVAC Construction, Plumbing Construction, and Electrical Construction for Mansfield University Campus Boiler Systems at 31 South Academy Street, Mansfield, Pennsylvania 16933. PROJECT NO. C-0410-0060 Phase 2 Contract No. DGS C-0410-0060 2.1 - General Construction Contract No. DGS C-0410-0060 2.2 - HVAC Construction Contract No. DGS C-0410-0060 2.3 - Plumbing Construction Contract No. DGS C-0410-0060 2.4 - Electrical Construction This project consists of the top priority scope items as selected by Commonwealth University from the Feasibility Study (Phase 1). The central campus steam heating / hot water system shall be decentralized by installing new localized boilers, select domestic water heaters, and other ancillary items at the thirteen (13) buildings across campus. Natural gas distribution system shall be upgraded to support the decentralized systems, which also includes a new natural gas cross-connection. Building automation systems (BAS) shall be updated accordingly. All buildings shall be able to be supported by a temporary boiler with appropriate hot water supply and return, power, and gas connections in the event of future system outages. Completion- 273 calendar days General Construction (.1) Contract: 1. Selective demolition of partitions, frames, and finishes. 2. New partitions and ceiling treatments, wall and floor treatments, new hollow metal doors, frames, and hardware. 3. Limited hazardous material abatement. 4. Site a. Natural gas distribution system shall be upgraded from steel to PVC and upsized to support the decentralized systems. b. New natural gas cross-connection. c. Decommissioning of steam vaults. d. Associated site work, including excavation, trenching, backfill, sidewalk, curbs, stamped concrete, and site restoration. SDB Participation - 12% ; VBE - 3% Question Deadline 12/29/2025 Questions during the bid stage shall be submitted via e-Builder under the Q&A Board tab in the Package's Invitation to Bid. Contract Documents must be submitted in e-Builder no later than close of business ten (10) days prior to the Bid Opening Date. Bid Result DGS C-0410-0060P2.1 Base Bid -J. C. Orr & Son, Inc. 2,266,928 Base Bid 2-J. C. Orr & Son, Inc. 2,266,928 Base Bid 3-J. C. Orr & Son, Inc. 2,266,928 DGS C-0410-0060P2.2 Base Bid-North Central Mechanical, Inc. 4,937,000 Base Bid 2-North Central Mechanical, Inc. 5,009,000 Base Bid 3-North Central Mechanical, Inc. 5,009,000 DGS C-0410-0060P2.3 Base Bid -MVP SPECIALTY SERVICES 593,868 Base Bid 2 -MVP SPECIALTY SERVICES 598,517.55 Base Bid 3 -MVP SPECIALTY SERVICES 730,963

Post-Bid

Power Plant

$23,679,133.00

Public - State/Provincial

Site Work

115

27

173

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
164
Bidding Soon
1,049
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2026

March 16, 2026

Project location map

31 N Academy St, Mansfield, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.