BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated December 11, 2025

Renovation of a medical facility in San Antonio, Texas. Completed plans call for the renovation of a medical facility.

Cooling Tower Fill Media Replacement University Health System is requesting pricing for labor and materials to replace the tower fill media for both cooling towers at the Christus Tower location (2827 Babcock Rd.), University Hospital Marley Tower (4502 Medical Dr.), Robert B Green CSB Facility RBG Tower (903 W. Martin St.) and TDI Facility TDI Tower (701 S. Zarzamora St.).

Post-Bid

Medical

$400,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
113
Bidding Soon
2,047
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2025

January 9, 2026

Project location map

Multiple Locations, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.