BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Site work and new construction of an educational facility in Framingham, Massachusetts. Conceptual plans call for the construction of a educational facility; and for site work for a educational facility.

The City of Framingham, Massachusetts, ("Owner"), acting through the Designer Selection Panel of the Massachusetts School Building Authority, (MSBA) is seeking the services of a qualified "Designer" within the meaning of the Massachusetts Designer Selection Law M.G.L. Chapter 7C, Sections 44 through 58 to provide Design Services for the Hemenway Elementary School Project in Framingham, Massachusetts ("Project"). An approved Proposed Project may include either the construction of a new Elementary School on the current site, at an alternate site at 77 Bethany Road or an addition and/or renovation of the existing Elementary School. The Owner is seeking design services initially for Feasibility Study and Schematic Design Services. The Feasibility Phase study will also include a study of redistricting at the elementary level, and consideration of Pre-K delivery. Subject to the approval of a Project by the MSBA and further subject to adequate funding authorized by the Owner, the contract between the Owner and the Designer may be amended to include continued Designer Services through design development, construction contract documents, bidding and award, construction administration, final closeout, and warranty period of a potential project. In accordance with the Commonwealth's Affirmative Marketing Program (AMP) established under M.G.L. Chapter 7C,6, participation goals for minority owned business enterprises (MBE) of 6.4%, women owned business enterprises (WBE) of 11.3%, and veteran business enterprise (VBE)/service-disabled veteran business enterprise (SDVOBE) of 3% are set for the Designer Services Contract. Firms responding to this RFQ should demonstrate a commitment to achieving these participation goals. The estimated construction cost is $60M - $134M depending on the solution agreed upon by the City and the MSBA, through an approved vote of the MSBA's Board of Directors. The fee for Basic Services will be negotiated. The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Educational

$134,000,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
662
Active Projects
349
Bidding Soon
4,737
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 24, 2026

Project location map

729 Water St, Framingham, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.