BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 3, 2025

Site work for a bridge / tunnel in Renton, Washington. Conceptual plans call for site work for a one-story above grade bridge / tunnel.

The City of Renton is seeking statements of qualifications from engineering consulting firms for engineering design and construction support services related to the Panther Creek at Talbot Road S Culvert Replacement Project – Design Phase II. The previous phase consisted of an alternatives assessment for the removal of a failing 32-inch fiberglass reinforced corrugated metal pipe and its replacement with a fish passable crossing, with a bridge selected and 10% design completed. This phase will complete the design of the bridge across Panther Creek and provide construction support services, requiring civil and structural engineering design and potentially geotechnical, surveying, and other supporting services.

Conceptual

Bridges / Tunnels

$200,000.00

Public - City

Site Work

41

4

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
0
Bidding Soon
1,047
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.