Published July 2, 2026 at 8:00 PM

Updated July 12, 2026

Site work for a power facility in Maxwell, California. Completed plans call for site work for a power facility.

Pre-Solicitation Synopsis - California Oregon Transmission Project (COTP) Series Capacitor Bank Two-Phase Design-Build Construction Project This is a pre-solicitation synopsis. Western Area Power Administration (WAPA), a Power Marketing Agency of the U.S. Department of Energy, intends to solicit proposals for the project described herein. In accordance with FAR Subpart 36.101-2 and FAR Part 15, the solicitation will be for a Fixed-Price, TwoPhase Design-Build contract for end-of-lifecycle replacement of four (4) banks of 525-kV series capacitors installed at four (4) substation locations within the California Oregon Transmission Project (COTP), which consists of the Tracy-Olinda and Olinda-Captain Jack 525-kV transmission lines. Performance will begin at time of award, with completion no later than June 30, 2033. The Contractor will engineer, procure, and construct (EPC) by removing and replacing the existing series capacitor banks with new and in-kind series capacitor banks (no changes to series capacitor size, rating, segmentation, and line compensation level). The Contractor shall perform engineering design for full integration of new series capacitor banks into WAPA's existing substation; as well as procure, install, test and commission all equipment. Competition will be full and open, unrestricted under North American Industry Classification System (NAICS) code 237130, Power and Communication Line and Related Structures Construction, with a size standard of $45.0M. The magnitude of this construction project is greater than $10,000,000. Phase One proposals will be evaluated for Corporate Experience and Capabilities, Key Project Experience and Technical Competency, and Past Performance. Only the most qualified Phase One offerors will be invited to participate in the Phase Two competition which will require a detailed, priced technical proposal and an oral presentation. The Government anticipates that the solicitation 89503326RWA000049 will be published to SAM.gov on or around January 6, 2026. Tentative acquisition milestone dates are as follows: Projected Acquisition Milestones Estimated Date Phase 1 Solicitation Period Start 1/6/2026 Offeror Questions Due 2/9/2026 Phase 1 Proposals Due 3/13/2026 GVT Notification to Phase 1 Offerors 4/6/2026 Phase 2 Solicitation Period Start 4/7/2026 Site Visit 5/4/2026-5/8/2026 Phase 2 Proposal Due 6/8/2026 Oral Presentations 6/22/2026-6/29/2026 Contract Award 9/28/2026 The Method of Contractor Selection has not been determined at this Time.

GC Bidding

Power Plant

$10,000,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
4
Bidding Soon
1,321
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2026

Project location map

Multiple Locations, Maxwell, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.