Published December 1, 2025 at 7:00 PM

Updated December 2, 2025

Site work and paving for a bridge / tunnel in Bloomington, Minnesota. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The work of this project includes: Replace Bridge deck waterproofing, install new deck drainage system, & paint steel beams, connect to storm sewer system, and repair concrete delamination under the bridge. The MCUB participation goal for this contract is 3% Question Deadline 12/12/2025 Direct inquiries to the Metropolitan Council Contract Administrator, Kimberley Ruedy, Kimberley.Ruedy@METC.state.MN.US This project includes maintenance repairs for Cedar Ave LRT Bridge 6663. The Work for this Project includes, but is not limited to the following: 1. At Bridge 6663, the CONTRACTOR will salvage and make removals on the bridge deck, prepare the steel deck plates, provide a new deck expansion joint, provide deck waterproofing and sloped ballast mat, provide longitudinal ballast drains, provide new end of deck drainage system, provide new embankment and trail paving, install salvaged materials, and provide new railings all as detailed in the Plan. 2. Additionally, at the underdeck area of Bridge 6663, the CONTRACTOR will provide a complete drainage system, prepare and paint the steel elements of the superstructure, make repairs to the concrete substructures, provide metal railing at the abutments, provide pyramid bollards at the piers, provide electrical lighting luminaires, and object marker signage all as detailed in the Plan. 3. The CONTRACTOR will supply the necessary traffic control and obtain permitting from MnDOT, Hennepin County, City of Minneapolis, Metro Transit, and any other permitting organizations.4. Hours of construction for work below the deck will be defined by traffic control permit restrictions. 5. The Blue Line LRT will be shut down and the OCS de-energized and the CONTRACTOR will have access to the NB and SB LRT track bays during this shut down. The CONTRACTOR shall not interfere with active LRT operations. 1. Hours of construction for work below the deck will be defined by traffic control permit restrictions. 2. There will be one rail and bridge extended weekend nighttime shutdown. 3. The CONTRACTOR will supply the ITL for all material testing. 4. The CONTRACTOR will need rail insurance and On-Line Metro Transit Rail Safety Certification. A. All work must comply and be accomplished with all federal, state and local laws, rules and regulations including, but not limited to OSHA regulations 29CFR1910, 29CFR1926 identified in these contract documents, and all applicable codes, rules and regulations of all local, state and federal regulation agencies

GC Bidding

Bridges / Tunnels

$400,000.00

Public - State/Provincial

Paving, Site Work

31

10

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
142
Bidding Soon
1,547
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 23, 2025

January 22, 2026

Project location map

Cedar Ave, Bloomington, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.