Site work for a civil project in Minco, Oklahoma. Completed plans call for site work for a water / sewer project.

Description Unit Quantity 1 6" PVC C900 DR-18 L.F. 6662 2 Bore and Install 12" STL. Casing L.F. 200 3 6" Valve E.A. 42 4 6" x 6" Tee E.A. 25 5 6" x 90 Bend E.A. 4 6 6" x 45 Bend E.A. 9 7 6" x 6" Cross E.A. 2 8 6" x 11.25 Bend E.A. 7 9 6" x 22.50 Bend E.A. 2 10 6" Cut & Plug E.A. 2 11 4" Cut & Plug E.A. 9 12 1" Cut & Plug E.A. 1 13 6'' x 4'' Reducer E.A. 9 14 6'' Interconnection E.A. 6 15 4'' Interconnection E.A. 9 16 Single Short Service E.A. 25 17 Single Long Service E.A. 16 18 Fire Hydrant E.A. 17 19 Fire Hydrant Removed E.A. 7 20 Gravel Paving Repair S.Y. 493 21 Asphalt Paving Repair S.Y. 154 22 Concrete Paving Repair S.Y. 310 23 Remove & Reset Mailbox E.A. 13 24 Remove & Reset Mailbox (Brick) E.A. 1 25 Remove & Reset Sign E.A. 1 Bidders are required to register on the website as plan holders to receive addenda and notifications. The Owner and Engineer shall not be held responsible for documents obtained from sources other than the designated website. Printed copies may be purchased directly from the website for an additional fee. Each bidder shall accompany the original bid with a certified or cashier's check on a solvent Oklahoma bank, or a Bidder's Bond in the amount of five percent (5%) of the total bid, as a guarantee of the bidder's ability to perform the contract bid upon and enter into a written contract with the Owner to furnish all required work and materials and provide the necessary bonds within ten (10) days after acceptance of the bid. The deposit of the successful bidder will be retained by the Owner as liquidated damages if the contract and required bonds are not executed within the time required. Deposits of unsuccessful bidders will be returned upon execution of the Contract and required bonds. Each bidder shall accompany the bid with the DW-412 Non-Collusion Affidavit and DW-413 Business Relationships Affidavit in accordance with ODEQ requirements. Performance, Maintenance, and Statutory Payment Bonds in the amount of 100% of the contract price, with a Corporate Surety licensed in Oklahoma and approved by the Owner and Engineer, will be required for faithful performance of the contract. A Maintenance Bond guaranteeing repair of all damage due to improper materials or workmanship for a period of two (2) years after acceptance by the Owner shall be required. This project is to be financed by a loan from the Oklahoma Water Resources Board (OWRB) through the Oklahoma Department of Environmental Quality (ODEQ) Drinking Water State Revolving Fund (DWSRF) and shall be referred to as DWSRF 26 12" CMP Install L.F. 35 27 Remove & Reset Picket Fence L.F. 10 28 Remove & Reset Barbed Fence L.F. 10 The Contractor shall furnish, install, and maintain a project identification sign meeting Oklahoma DEQ and OWRB DWSRF requirements. The sign shall be 4' x 6', professionally painted, and constructed per standard details showing the project name, owner, loan amount, engineer, contractor, and funding acknowledgment. The sign shall remain in place and be maintained in good condition throughout construction. Question Deadline 12/11/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Submitted via instructions at Designated Website at www.civcastusa.com Questions received less than seven days prior to the date for opening of Bids may not be answered

GC Bidding

Water / Sewer

$800,000.00

Public - City

Site Work

45

26

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
39
Bidding Soon
758
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

March 2, 2026

Project location map

Multiple Locations, Minco, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.