Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 18, 2025 at 7:00 PM
Updated December 19, 2025
Renovation of a municipal facility in Stratford, Ontario. Completed plans call for the renovation of a municipal facility.
Perth County is requesting tenders to supply all labour, material and equipment for the Courthouse Vault roof replacement. The work consists of the supply of all labour, material, equipment and supervision necessary to complete the work shown, or described by, or reasonably inferred from these contract documents. Without limiting the qualifications of the foregoing, the work consists of the following: Courthouse Vault Roof Replacements. All work shall be carried out in accordance with the current standards and recommendations set out by the Ontario Industrial Roofing Construction Association (OIRCA). A. Modified bituminous roofing work including but not limited to: 1. Minimum One (1) ply of 80-mil approved modified bitumen base sheet meeting ASTM D6161, Type I with bitumen. 2. Hot Bitumen (System Option 1): ASTM D312, Type III steep asphalt having the following characteristics: a. Softening Point 185F - 205F b. Flash Point 500F c. Penetration @ 77F 15-35 units d. Ductility @ 77F 2.5 cm 3. Solvent Free Cold Applied Adhesive (System Option 2): zero V.O.C., moisture cured, rubber polymer modified, non-asbestos containing cold applied adhesive for roof slopes up to 3:12. A. Non-Volatile Content ASTM D4586 100% B. Density ASTM D1475 11.2 lbs./gal. (1.11 g/m3) C. Viscosity Stormer ASTM D562 16-20 sec. D. Flash Point ASTM D93 400 F min. (232 C) E. Slope: up to 3:12 4. Base Flashing Ply: One (1) ply of 40 mil SBS base flashing ply covered by an additional layer of modified bitumen membrane and set in bitumen 5. Modified Membrane (System Option 2): 110 mil SBS and SIS (Styrene-Butadiene-Styrene and Styrene-Isoprene-Styrene) rubber modified roofing membrane reinforced with a dual fiberglass scrim and polyester mat. 6. Surfacing: Flood coat of cold applied, polymer modified, fiber reinforced bitumen (maximum VOC 250g/L), meeting class A fire rating and ASTM D1863 roofing aggregate consisting of pea gravel 7. Roofing Aggregate: To conform to ASTM D1863 a. Pea Gravel
Bid Results
Municipal
$86,020.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 17, 2025
January 16, 2026
1 Huron St, Stratford, ON
Related To This Project
Stratford, ON
Bid Date: Jan 15 2026
Stratford, ON
Bid Date: Dec 23 2025
Stratford, ON
--
Stratford, ON
Bid Date: Nov 12 2025
Stratford, ON
Bid Date: Dec 18 2025
Stratford, ON
Bid Date: Jul 29 2021
Stratford, ON
Bid Date: Dec 04 2025
Stratford, ON
Bid Date: Nov 21 2025
Stratford, ON
Bid Date: Nov 13 2025
Stratford, ON
--
Stratford, ON
Bid Date: Nov 07 2025
Stratford, ON
Bid Date: Oct 17 2025
Stratford, ON
Bid Date: Oct 17 2025
Stratford, ON
Bid Date: Sep 17 2025
Stratford, ON
Bid Date: Aug 22 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
