Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

This is a service / maintenance or supply contract in Manhattan Beach, California. Contact the soliciting agency for additional information.

Project Description The City seeks a Consultant to perform professional engineering services for the American Martyrs Stormwater Sump Hydrology and Capacity Study. The Consultant shall communicate their review and findings for the area as per their expertise, make minor and major recommendations for drainage improvements and long-term resiliency, create conceptual diagrams, as well as provide probable costs and schedule. The final deliverable will be an assessment report outlining the recommendations for any deficiencies unfit per the latest standards, codes, and requirements of all applicable agencies. The selected Consultant may be utilized for design development following the completion of the report if the City elects to proceed with a recommendation; however, this will depend on performance and additional contract approval, and is not guaranteed. Background Project Area Refer to Appendix E for Location Map. The American Martyr's Sump is located directly adjacent to American Martyrs School and is situated in a localized low point, where stormwater runoff from the adjacent developed areas is transferred to the sump. Project Background On occasion during periods of heavy stormwater runoff, American Martyr's Sump capacity has overflowed and encroached into the adjacent school play and building areas. In 1999, a hydrology report (Appendix F) was created which calculated peak flow, volume of runoff for three storm periods (including Los Angeles County Department of Public Works criteria), and presented four possible solutions for remediation. The hydrologic method was able to identify the 50-year, 4-day storm as the leading design plan for recommendations lowering the risk of flood damage. The study analyzed infiltration rates and options for gravity systems, a pump station, and discharge directly to the ocean via a new underground storm drain system. The California Coastal Commission, Los Angeles County Department of Public Works, and California Regional Water Quality Control Board all expressed concern for protection of marine life, health, water quality, stormwater treatment, necessary clearances, and permits if water would not be retained. For these reasons, and the fact that the existing sump was determined to percolate with reasonable efficiency at the time, it was recommended to City Council that no further action be taken regarding the American Martyrs stormwater sump. Stormwater has flooded adjacent areas again, indicating that the sump's capacity and/or infiltration rates may no longer be sufficient. With changes that occur due to the environment, rainfall, agency requirements, and overall hydrology over the years, an update to the 1999 hydrology report is necessary to verify the required sump capacity and to propose drainage options and maintenance protocol along with their associated costs. Bid Valid: 120 Days Question Deadline 12/10/2025 at 10:00 AM PT All questions must be submitted through online. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
1
Bidding Soon
1,872
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

721 15th St, Manhattan Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.