Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 2, 2026 at 7:00 PM
Updated January 3, 2026
Site work for a power facility in Sudan, Texas. Completed plans call for site work for a power facility.
As of 1/2/2025, this project has been awarded to J & R Welding and Construction LLC but the award amount was not confirmed. The City of Sudan is requesting proposals to construct fencing around two generators on two separate sites. The City of Sudan reserves the right to accept or reject any or all proposals, alter specifications on the accepted proposal, and to accept the proposal that best serves the interest of the City of Sudan, Texas. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Project #1 Location: City Hall and Community Center, 111 East 1st Ave., Sudan, TX 1. Construct 41' (includes 10' gate) 9 gauge (GAW) chain link fence 6'tall with three strand barbed wire, two sides 14'wide; one side13'which includes a 10' gate 2. 10'wide gate, 2-5'gate panels, with 1 5/8" Schedule 40 welded frame and heavy duty hinges 3. 2 7/8" Schedule 40 Terminal and Gate Posts set 3' in concrete 4. 1 7/8" Schedule 40 Line Posts set 2" in concrete 5. 1 5/8" Schedule 40 Top Rail 6. 9 gauge (GAW) smooth bottom tension wire Project#2 Location: Well #6, 4 miles north of Sudan, TX on FM 303, then V2 mile east on dirt road 1. Construct 45' (includes 10' gate) 9 gauge (GAW) chain link fence 6'tall with three strand barbed wire, two sides 18'wide, one side includes a 10' gate ; and one side 9' wide 2. 10'gate, 2-5'gate panels with 1 5/8" Schedule 40 welded frame and heavy duty hinges 3. 2 7/8" Schedule 40 Terminal and Gate Posts set 3' in concrete 4. 1 7/8" Schedule 40 Line Posts set 2" in concrete 5. 1 5/8" Schedule 40Top Rail 6. 9 gauge (GAW) smooth bottom tension wire
Award
Power Plant
$50,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2025
January 8, 2026
Multiple Locations, Sudan, TX
Related To This Project
Sudan, TX
Bid Date: May 08 2025
Sudan, TX
Bid Date: May 08 2025
Sudan, TX
Bid Date: Nov 01 2024
Sudan, TX
--
Sudan, TX
Bid Date: Oct 04 2024
Sudan, TX
Bid Date: Sep 04 2024
Sudan, TX
Bid Date: Nov 14 2023
Sudan, TX
Bid Date: May 05 2023
Sudan, TX
--
Sudan, TX
Bid Date: Sep 07 2022
Sudan, TX
Bid Date: Nov 09 2022
Sudan, TX
Bid Date: Nov 03 2022
Rosenberg, TX
Bid Date: Jan 21 2026
Knox City, TX
Bid Date: Jan 08 2026
Killeen, TX
Bid Date: Jan 06 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
