BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 23, 2025 at 7:00 PM

Updated December 24, 2025

Site work and paving for a mixed-use development in Walla Walla, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Work includes utility replacements, roadway reconstruction, and pedestrian improvements. The Contractor is subject to all requirements related to Davis Bacon Wage Rates and/or State Prevailing Wage Rates, EEO, and Washington State Contracting Laws, etcetera. The Contract time for all work shall be eighty (80) working days. This Contract provides for but is not limited to the improvement and replacement of the underground water, sanitary sewer, and stormwater utilities, and the reconstruction of the roadway on Hobson Street between S Clinton Street and S Division Street, S Madison Street between Hobson Street and E Alder Street and S Division Street between the bridge at Mill Creek and E Alder Street. This and all other work shall be done in accordance with the a9ached Contract Plans, these Contract Provisions, Standard Specifications, the City of Walla Walla Standard Plans, and the WSDOT Standard Plans.

Post-Bid

Roads / Highways

$1,750,000.00

Public - City

Paving, Site Work

17

8

6

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
28
Bidding Soon
270
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2025

February 20, 2026

Project location map

55 E Moore St, Walla Walla, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.