Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 14, 2026 at 7:00 PM
Updated January 15, 2026
Site work and paving for a mixed-use development in Walla Walla, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
** As of January 12, 2026 project has been awarded to Culbert Construction Inc. with an amount of $1,367,179.89.** Work includes utility replacements, roadway reconstruction, and pedestrian improvements. The Contractor is subject to all requirements related to Davis Bacon Wage Rates and/or State Prevailing Wage Rates, EEO, and Washington State Contracting Laws, etcetera. The Contract time for all work shall be eighty (80) working days. This Contract provides for but is not limited to the improvement and replacement of the underground water, sanitary sewer, and stormwater utilities, and the reconstruction of the roadway on Hobson Street between S Clinton Street and S Division Street, S Madison Street between Hobson Street and E Alder Street and S Division Street between the bridge at Mill Creek and E Alder Street. This and all other work shall be done in accordance with the a9ached Contract Plans, these Contract Provisions, Standard Specifications, the City of Walla Walla Standard Plans, and the WSDOT Standard Plans.
Award
Roads / Highways
$1,367,180.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 22, 2025
February 20, 2026
55 E Moore St, Walla Walla, WA
Related To This Project
Walla Walla, WA
Bid Date: Dec 22 2025
Walla Walla, WA
Bid Date: Jan 13 2026
Walla Walla, WA
Bid Date: Jan 08 2026
Walla Walla, WA
Bid Date: Jan 08 2026
Walla Walla, WA
Bid Date: Dec 22 2025
Walla Walla, WA
--
Walla Walla, WA
Bid Date: Jan 08 2026
Walla Walla, WA
Bid Date: Jan 15 2026
Walla Walla, WA
Bid Date: Jan 06 2026
Walla Walla, WA
Bid Date: Nov 24 2025
Walla Walla, WA
--
Walla Walla, WA
Bid Date: Oct 22 2025
Walla Walla, WA
--
Walla Walla, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
