BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Site work and paving for a mixed-use development in West Allis, Wisconsin. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work under this Contract consists of the reconstruction of the West Allis 74th-75th Street Rogers Park and includes installation of Porous Pavement, 4" asphalt pavement over 8" dense graded base course, curb and gutter replacement, miscellaneous concrete sidewalk, concrete driveway approaches, , storm sewer and storm catch basin and manhole replacement, light poles, electrical conduit, landscaping, playground equipment installations, rain garden installations and all incidental items necessary to complete the work as shown on the Plans and included in these Special Provisions. Pre-Qualification: Yes The work shall consist of the furnishing and laying of live sod on the shoulders, slopes, ditches, or other locations as designated, and the construction of sod ditch checks or similar appurtenances as shown on the Plans, in the contract or as ordered and laid out in the field by the Engineer in accordance with the specifications. This work shall consist of preparing seed beds, furnishing and sowing the required seed on shoulders, slopes, appurtenances and other areas as shown on the Plans or designated in the Contract, or as ordered to be seeded by the Engineer. The work shall consist of the furnishing and laying of live sod on the shoulders, slopes, ditches or other locations as designated, and the construction of sod ditch checks or similar appurtenances as shown on the plans, in the contract, or as ordered and laid out in the field by the Engineer in accordance with the specifications. This work shall consist of preparing seed beds, furnishing, sowing, and watering the required seed on shoulders, slopes, appurtenances and other areas as shown on the plans or designated in the contract, or as ordered to be seeded by the Engineer. The City shall supply the water for seed watering at no cost to the Contractor. The Contractor shall obtain a permit and meter fitting from the West Allis Water Department and use only on the designated hydrants.

GC Bidding

Playgrounds / Parks / Athletic Fields

$600,000.00

Public - City

Paving, Site Work

21

13

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
343
Active Projects
195
Bidding Soon
2,276
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.